Turkish gold imports go through the roof in Nov '14

Published: Jan 4, 2015 10:11
The gold imports by Turkey surged to record high during the month of November 2014.

Author: Paul Ploumis
02 Jan 2015 Last updated at 07:02:11 GMT
ANKARA (Scrap Monster): The gold imports by Turkey surged to record high during the month of November 2014. According to data published by the Istanbul Gold Exchange, the country's gold imports totaled 46.9 tons worth nearly $2 billion. This is the highest gold imports in almost 1.5 years, it added.

The Nov '14 gold imports by Turkey surged by over 600% when compared with the imports of 6.6 tons of gold bullion during October. When compared with the imports during the same month a year ago, the Nov '14 more than doubled. Turkey had imported 19.3 tons of gold during November 2013.

However, the cumulative gold imports by Turkey during the initial eleven-month period of the year declined 56% from 270.70 tons in 2013 to 119.10 tons in 2014. It must be noted that the country had reported heavy intake of gold during 2013 on account of significant boom in business with Iran. The Turkish gold imports had touched record level of 302.30 tons, equivalent to $16 billion.

Turkey's gold production is insufficient to meet its demand. The country imports gold to sell it to gold buyers in India, Iran and Middle East. In addition, many Turks consider gold as a traditional investment as a hedge against declining currency. The Turks also consume huge quantities of gold in the form of jewelry as gift on special occasions.

Meanwhile, higher gold imports worsened the country's trade deficit. The deficit for the month of November stood at $8.3 billion, almost $1 million higher than estimates.
 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
14 hours ago
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
Read More
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis] The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product
[SMM Analysis: The "Counter-Cyclical" Logic of Copper Smelting: When Sulfuric Acid Becomes the Main Product]
14 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
15 hours ago
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
Read More
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
BC Copper 2604 Closed Lower with a Wide Trading Range, Pressured by Both Geopolitics and Interest Rate Cut Expectations [SMM BC Copper Commentary]
15 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
15 hours ago
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Read More
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Inner Mongolia Approves 500 kV Project, Boosting Ordos City's Power Grid in 14th Five-Year Plan
Recently, the 500 kV transmission and transformation project of Jiri (Kusha II) was officially approved by the Energy Bureau of Inner Mongolia Autonomous Region, marking a good start for the power grid construction of Ordos City in the first year of the 14th Five-Year Plan. The project is located in the territory of Hangjin Banner, with a total investment of 1.52554 billion yuan. It is a key hub project to ensure the output and consumption of new energy power in the northwestern region of Hangjin Banner. The project plans to build one 500 kV substation and about 194 km of 500 k V lines, which will pass through Hangjin Banner and Dalad Banner.
15 hours ago
Turkish gold imports go through the roof in Nov '14 - Shanghai Metals Market (SMM)