Tiangong Installs Second-Gen Plasma Atomization Equipment for Titanium Powder, Targets 3D Printing Market

게시됨: May 28, 2026 15:40
[SMM Titanium Express]The first second-generation plasma atomization (PA) equipment for Tiangong's titanium alloy powder project has been installed, with first batch output expected in June, targeting consumer electronics 3D printing. The project plans 3,000 tpa of second-generation PA capacity, with Phase 1 (1,000 tpa) already under construction. PA achieves fine powder yield of 30-55%, compared to ~15% for PREP technology. Current TC4 titanium powder prices for 3D printing have dropped to RMB 200-300/kg.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
Tsingshan Invests $1.2B in Titanium Expansion, Aims for 150K Tonne Annual Capacity by 2029
2026년 6월 7일 22:08
Tsingshan Invests $1.2B in Titanium Expansion, Aims for 150K Tonne Annual Capacity by 2029
더 보기
Tsingshan Invests $1.2B in Titanium Expansion, Aims for 150K Tonne Annual Capacity by 2029
Tsingshan Invests $1.2B in Titanium Expansion, Aims for 150K Tonne Annual Capacity by 2029
【SMM Titanium Flash】According to a filing by the Fu'an Development and Reform Bureau, stainless steel giant Tsingshan (Qingtuo Group) plans to invest RMB 1.2 billion to expand its titanium business. The project targets an annual capacity of 150,000 tonnes of titanium and titanium alloy plates/strips. Located within the existing plant area, the project covers 70,000 sqm and includes 50,000 sqm of new workshops and supporting facilities. Key investments include the procurement of precision cold-rolling mills and ancillary equipment, with installation costs reaching RMB 100 million. The construction period is set from October 2026 to December 2029. This move signifies Tsingshan's aggressive push into the high-end titanium sector, leveraging its integrated "raw material-smelting-processing
2026년 6월 7일 22:08
Anning Co. to Issue RMB 2.5B in Bonds for Titanium and Iron Ore Projects Expansion
2026년 6월 7일 22:05
Anning Co. to Issue RMB 2.5B in Bonds for Titanium and Iron Ore Projects Expansion
더 보기
Anning Co. to Issue RMB 2.5B in Bonds for Titanium and Iron Ore Projects Expansion
Anning Co. to Issue RMB 2.5B in Bonds for Titanium and Iron Ore Projects Expansion
【SMM Titanium Flash】China’s titanium ore leader, Anning Co., Ltd., plans to issue convertible bonds to raise up to RMB 2.5 billion. The funds will be allocated to iron ore and titanium industry chain expansion projects. Key allocations include RMB 1.157 billion for the Duijingou tailings storage facility to secure long-term iron ore resources, and RMB 715 million for a cold rolling and logistics project in Changzhou. This initiative bridges the gap between semi-finished titanium products and end-users, integrating its "60,000-ton energy-grade titanium materials" project. The move aims to perfect the "titanium ore—titanium materials" full-industry-chain layout, solidifying the company's vertical integration and market competitiveness.
2026년 6월 7일 22:05
Sheffield Resources Boosts Production at Thunderbird Project, Exceeds 1M Tonnes of Ore Mined in May
2026년 6월 7일 22:03
Sheffield Resources Boosts Production at Thunderbird Project, Exceeds 1M Tonnes of Ore Mined in May
더 보기
Sheffield Resources Boosts Production at Thunderbird Project, Exceeds 1M Tonnes of Ore Mined in May
Sheffield Resources Boosts Production at Thunderbird Project, Exceeds 1M Tonnes of Ore Mined in May
【SMM Titanium Flash】 Australia's Sheffield Resources reported a significant production boost at its Thunderbird mineral sands project in Western Australia for May. Ore mined exceeded 1 million tonnes, yielding approximately 60,000 tonnes of ilmenite and 16,500 tonnes of zircon, marking a substantial increase compared to March. The improvement is attributed to better equipment availability (DMUs and bulldozers), optimized processing parameters, and the operational separation of mining units. Executive Chairman Bruce Griffin stated that these changes are positively impacting performance, with ongoing optimization plans aimed at ensuring stable, long-term output growth and strengthening the company's titanium and zircon supply capabilities.
2026년 6월 7일 22:03
[SMM Titanium Express]The first second-generation plasma atomization ( - Shanghai Metals Market (SMM)