The most-traded BC copper contract closed down 2.85%, as speculative fervor cooled, weighing on copper prices [SMM BC Copper Review]

Published: Jan 30, 2026 19:52

Today, the most-traded BC copper 2603 contract opened at 98,140 yuan/mt. At the start of trading, copper prices touched a high of 101,150 yuan/mt, then the price center fell sharply. During the morning session, it hit a low of 90,450 yuan/mt, and finally closed at 91,890 yuan/mt, down 2.85%. Open interest reached 6,460 lots, an increase of 335 lots from the previous trading day, while trading volume reached 26,587 lots, up 12,040 lots from the previous session. On the macro front, upward momentum was insufficient, and bulls took profits. In addition, gold and silver prices cooled, putting downward pressure on copper prices. On the fundamentals side, imported supply increased, leading to a looser supply situation; demand side, constrained by high copper prices, overall demand remained weak.

SHFE copper 2603 contract closed at 103,680 yuan/mt. Based on the BC copper 2603 contract price of 91,890 yuan/mt, its after-tax price is 103,836 yuan/mt. The price spread between SHFE copper 2603 and BC copper was -156, maintaining an inverted spread which narrowed compared to the previous day.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Domestic Trade Premiums Hold Steady and Rise, Fundamental Consumption Maintains Resilience [SMM Copper Morning Meeting Summary]
45 mins ago
Domestic Trade Premiums Hold Steady and Rise, Fundamental Consumption Maintains Resilience [SMM Copper Morning Meeting Summary]
Read More
Domestic Trade Premiums Hold Steady and Rise, Fundamental Consumption Maintains Resilience [SMM Copper Morning Meeting Summary]
Domestic Trade Premiums Hold Steady and Rise, Fundamental Consumption Maintains Resilience [SMM Copper Morning Meeting Summary]
SMM Morning Meeting Minutes: Overnight, LME copper opened at $13,744/mt, dipped to $13,725/mt shortly after the opening, then its price center fluctuated upward to touch $13,822.5/mt, followed by wild swings and finally closed at $13,796.5/mt, up 0.61%. Trading volume reached 16,600 lots, open interest stood at 263,000 lots, a decrease of 3,509 lots from the previous trading day, manifested as bearish position reduction. Overnight, the most-traded SHFE copper 2607 contract opened at 105,490 yuan/mt, hitting a high of 105,700 yuan/mt right after the opening, then its price center fluctuated downward all the way, touching a low of 105,060 yuan/mt near the end of trading, and finally closed at 105,210 yuan/mt, down 0.14%. Trading volume reached 25,000 lots, open interest stood at 147,000 lots, a decrease of 1,715 lots from the previous trading day, manifested as bullish position reduction.
45 mins ago
Yihao New Materials Reports 50.85% YoY Net Loss Increase, HVLP Copper Foil in Testing Phase
16 hours ago
Yihao New Materials Reports 50.85% YoY Net Loss Increase, HVLP Copper Foil in Testing Phase
Read More
Yihao New Materials Reports 50.85% YoY Net Loss Increase, HVLP Copper Foil in Testing Phase
Yihao New Materials Reports 50.85% YoY Net Loss Increase, HVLP Copper Foil in Testing Phase
[Yihao New Materials: 2025 Net Loss of RMB 58.6219 Million Widened 50.85% YoY, HVLP Copper Foil Still in Sample Testing Stage] Yihao New Materials announced that the cumulative deviation in its closing price increase over the two consecutive trading days on June 15 and June 16, 2026, reached 30%, constituting abnormal fluctuation in stock trading. After self-inspection, the company stated that previously disclosed information requires no correction or supplement; there have been no significant changes in recent production and operations or in the internal and external business environment; the controlling shareholder and actual controller have no undisclosed matters that should have been disclosed, and did not trade the company’s shares during the fluctuation period. The company warned of risks, noting that its net loss attributable to shareholders of the listed company for 2025 was RMB 58.6219 million, a loss that widened by 50.85% YoY compared to 2024, and its overall performance was weaker than the industry average. The certification progress for its HVLP copper foil is slower than some of its peers; it is currently in the sample testing, analysis, and certification stage and has not yet generated revenue. In addition, the second-phase 5,500-mt production line of the “High-Precision Electrolytic Copper Foil Project with an Annual Capacity of 10,000 mt” raised investment project is advancing equipment installation and commissioning, and the commissioning time is subject to uncertainty.
16 hours ago
Yunnan Energy to Invest in 25 MW Mugua Ping Wind Farm Project, Expected Completion in 10 Months
16 hours ago
Yunnan Energy to Invest in 25 MW Mugua Ping Wind Farm Project, Expected Completion in 10 Months
Read More
Yunnan Energy to Invest in 25 MW Mugua Ping Wind Farm Project, Expected Completion in 10 Months
Yunnan Energy to Invest in 25 MW Mugua Ping Wind Farm Project, Expected Completion in 10 Months
[Yunnan Energy Investment: Company Plans to Invest in the Mugua Ping Wind Farm Project] Yunnan Energy Investment announced that its controlling shareholder, Yunnan Energy Group, was the bid winner for the Fuyuan County Mugua Ping Wind Farm Project under Yunnan Province's third batch of new energy projects in 2025. In accordance with Yunnan Energy Group's overall strategy and the relevant requirements for the development and construction of Yunnan Province's third batch of new energy projects in 2025, the company will actively proceed with the construction of the Fuyuan County Mugua Ping Wind Farm Project. The project is expected to have a total installed capacity of 25 MW and a total construction period of 10 months.
16 hours ago