Pan American Silver Reports Q1 2025 Production Results with Significant Increases in Zinc and Lead Output

게시됨: May 9, 2025 09:16

[Pan American Reports Q1 2025 Production Results]

On May 7, Pan American Silver released its Q1 2025 report, disclosing consolidated output from its zinc-lead operations. During the quarter, the company’s four zinc-lead mines produced approximately 14,000 tonnes of zinc in concentrate and 6,700 tonnes of lead in concentrate, representing year-on-year increases of 42.9% and 45.7%, respectively.

Performance by mine:

La Colorada (Mexico): 3,400 tonnes zinc in concentrate, 1,900 tonnes lead in concentrate

San Vicente (Bolivia): 2,600 tonnes zinc in concentrate, 300 tonnes lead in concentrate

Huaron (Peru): 6,300 tonnes zinc in concentrate, 4,100 tonnes lead in concentrate

Minera Florida (Chile): 1,700 tonnes zinc in concentrate, 400 tonnes lead in concentrate

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn