【Stellantis and Zero Run to start Malaysia localization assembly project】
Recently, Stellantis Group and Zero Run announced the upcoming Malaysia localization assembly project, which will be based at Stellantis’ existing Gurun factory in Kedah, Malaysia. With an initial investment of 5 million euros (around 24 million Malaysian ringgit), the project is scheduled to commence local production of Zero Run’s C10 model by the end of 2025.
![마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)


