Tender for EPC Energy Storage System Project of 600MW Wind Power Generation-Grid-Load-Storage in Hami, Xinjiang

게시됨: Apr 16, 2025 18:09 (GMT+8)
On April 15, China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. issued a tender announcement for the procurement of the energy storage system project of the EPC general contracting project for the 600MW wind power project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage. The current phase involves the construction of 60MW/120MWh, and the procurement scope includes containerized converter and step-up integrated units, 20-foot containerized ESS battery systems, energy management systems, video surveillance equipment, cables, copper busbars and their accessories, fire alarm and firefighting systems, HVAC systems, 3kV power cables and their accessories, 35kV power cables and their accessories, lighting and power systems, PVC pipes, hot-dip galvanized steel pipes and other pipe materials, as well as corresponding spare parts, special tools and instruments, on-site construction, installation, commissioning, testing, trial operation, acceptance, production training, technical documentation, and related packaging, transportation services, and technical services.

Tender Announcement for the Procurement of the Energy Storage System Project of the EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage

I. Tender Conditions
The EPC general contracting project for the 600MW wind power project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage (Tender Project No.: GDDLSJYJY_FGS_037642-HW-ZCNX00534-FGS_037642-2025-004) has been approved by the project approval/verification/filing authority. The project funding source is self-raised by the owner, and the bid inviter is China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. The project has met the tender conditions and is now open for public bidding.

II. Project Overview and Tender Scope
Project Scale: 600MW
Tender Content and Scope: This tender project is divided into 1 section, and this tender is for: Section (Package) Number Last Three Digits + Section Package Name: EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage
Section (Package) Content:
1. The bidder is responsible for the energy storage system project, including but not limited to the following parts: design, procurement, survey and design, construction, commissioning, acceptance, production training, etc.:
The bidder shall be responsible for the complete design of all equipment processes, electrical (including fire alarm systems), monitoring, energy storage power station (firefighting, drainage), paint insulation, all equipment (35kV collection line switches are not within the supply scope), facilities, material supply, construction, installation, commissioning, technical services, and production training for the energy storage power station and its auxiliary system areas, including but not limited to the following parts, the bidder's scope shall at least include the following:
1) Site ancillary facilities
2) Electrical system: The current phase involves the construction of 60MW/120MWh, connected to the 35kV switchgear interface of the collection station at the 35kV voltage level.
3) Control system: All necessary for the design, supply, and installation of the energy storage power station system, and connected to the main control system communication network, cooperating to complete the control logic design, configuration, and commissioning of the energy storage system project and the collection station.
4) Communication system: The communication power cabinet mainly contains UPS, EMU, switches, transformer measurement and control, and various power distribution outputs.
The power supply for the communication power cabinet adopts the self-power supply method of the PCS complete set device.
The power supply for communication monitoring, EMU, electromagnetic locks, transformer measurement and control, and switches is supplied through UPS uninterruptible power supply, with the UPS power configured according to the specific load situation, and the backup power duration is not less than 15 minutes.
Dual communication interfaces should be adopted, with control and monitoring separated.
The communication adopts a dual-loop wiring method: one loop for control and the other for monitoring. Including no less than 2 serial ports and 2 goose network ports provided by the PCS; no less than 2 network ports provided by the EMU device, meeting the access requirements of the collection station centralized control.
The bidder shall provide the bid inviter with the necessary spare parts, special tools, and lists required for installation, commissioning, and within the warranty period.
All product models, parameters, and subcontracting and externally purchased brands provided by the bidder must be approved by the bid inviter before procurement, and the procurement list shall be submitted to the bid inviter. The quantity of products provided by the bidder must meet the project needs.
2. Energy storage system project: containerized converter and step-up integrated units, 20-foot containerized ESS battery systems, energy management systems, video surveillance equipment, cables, copper busbars and their accessories, fire alarm and firefighting systems, HVAC systems, 3kV power cables and their accessories, 35kV power cables and their accessories, lighting and power systems, PVC pipes, hot-dip galvanized steel pipes and other pipe materials, as well as corresponding spare parts, special tools and instruments, on-site construction, installation, commissioning, testing, trial operation, acceptance, production training, technical documentation, and related packaging, transportation services, and technical services.
3. The bidder guarantees that the provided equipment is new, advanced, mature, complete, and safe and reliable, and the technical and economic performance of the equipment system meets the requirements of the second volume of technical specifications. The bidder shall provide a detailed supply list according to the second volume of technical specifications, but not limited to its equipment and devices. The bidder's detailed list shall sequentially specify the model, quantity, origin, producer, etc. For components necessary for the operation and construction of the complete set of equipment within the bidder's supply scope, even if not listed or insufficient in quantity in the contract annex, the bidder shall still supplement them free of charge during contract execution. The bidder's final supply shall meet the functional requirements of the process system, and the equipment increase caused by this shall not involve cost adjustment. All externally purchased component manufacturers must be confirmed by the bid inviter.

III. Bidder Qualification Requirements
Open Tender for the Energy Storage System Project of the EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage:
3.1 The bidder shall be legally established and meet the following requirements:
① A corporate legal person registered and established within the territory of the People's Republic of China, with the ability to independently bear civil liabilities, and the ability to independently undertake procurement projects and perform contracts.
② Enterprises of the same legal person or affiliated enterprises (parent company, wholly-owned subsidiaries, and their holding companies) are only allowed to have one participate in this project's response, otherwise, all responses will be treated as invalid.
③ Not in a state of being ordered to suspend business, property being taken over, frozen, or bankrupt. Not listed in the national enterprise credit information publicity system (.cn) by the administrative authority for industry and commerce as a seriously illegal and dishonest enterprise; not listed in the "Credit China" website (.cn) by the Supreme People's Court as a dishonest person subject to enforcement.
④ Within the past three years, in the process of bidding activities, contract performance, and after-sales service, has not been publicly criticized by China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. and its parent companies, and has not been included in the supplier blacklist of China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. and its parent companies.
⑤ Other instructions: (1) Legal persons, other organizations, or individuals that have an interest relationship with the bid inviter that may affect the fairness of the bidding shall not participate in the bidding. (2) Different units with the same person in charge or with control or management relationships shall not participate in the bidding for the same section or the same bidding project without section division. Violation of the above two provisions will result in the invalidity of the relevant bids.
⑥ Have completed the supply of energy storage equipment from January 1, 2020, to the present.
⑦ Have qualifications related to the construction, installation, and commissioning services of power engineering projects, or the entrusted unit shall have qualifications related to the construction, installation, and commissioning services of energy storage equipment.
⑧ This project does not accept joint venture responses.
This project does not allow joint venture bidding.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
스마트 커넥티드 차량 계획 본격 시행; 글로벌 진출과 보급률 상승이 자동차 업종 견인
2026년 09월 24일 16:53 (GMT+8)
스마트 커넥티드 차량 계획 본격 시행; 글로벌 진출과 보급률 상승이 자동차 업종 견인
더 보기
스마트 커넥티드 차량 계획 본격 시행; 글로벌 진출과 보급률 상승이 자동차 업종 견인
스마트 커넥티드 차량 계획 본격 시행; 글로벌 진출과 보급률 상승이 자동차 업종 견인
데이터에 따르면 8월 자동차 생산과 판매는 전월 대비 4% 이상 증가했고, 신에너지차 생산과 판매는 전년 동기 대비 약 18% 증가했으며, 침투율은 60.6%로 사상 최고치를 기록했다. 수출은 3개월 연속 100만 대를 넘어섰고 전년 동기 대비 65% 이상 증가했으며, 신에너지차 수출 비중은 52%로 상승했다. 중국 브랜드 승용차 시장 점유율은 77.76%에 달해 전년 동기 대비 8%포인트 이상 증가했다.
2026년 09월 24일 16:53 (GMT+8)
NARI 그리드 수주 급증; 해외 에너지 저장, 제2의 성장 곡선 열다
2026년 09월 24일 16:52 (GMT+8)
NARI 그리드 수주 급증; 해외 에너지 저장, 제2의 성장 곡선 열다
더 보기
NARI 그리드 수주 급증; 해외 에너지 저장, 제2의 성장 곡선 열다
NARI 그리드 수주 급증; 해외 에너지 저장, 제2의 성장 곡선 열다
데이터에 따르면 2026년 상반기 NARI의 매출은 277억 6,700만 위안으로 전년 동기 대비 14.54% 증가했으며, 모회사 귀속 순이익은 30억 7,300만 위안으로 4.08% 증가했다. 신규 계약 총액은 456억 3,300만 위안으로 28.79% 급증했다. 해외 매출은 58억 9,400만 위안으로 196.61% 폭증했으며, 오만에서 500MW급 에너지 저장 EPC 프로젝트를 수주했다.
2026년 09월 24일 16:52 (GMT+8)
8월 말 기준 전국 누적 발전 설비 용량 41억 300만 kW 달성
2026년 09월 24일 16:51 (GMT+8)
8월 말 기준 전국 누적 발전 설비 용량 41억 300만 kW 달성
더 보기
8월 말 기준 전국 누적 발전 설비 용량 41억 300만 kW 달성
8월 말 기준 전국 누적 발전 설비 용량 41억 300만 kW 달성
8월 말 기준, 전국 누적 발전 설비 용량은 41억 300만 kW로 전년 동기 대비 11.1% 증가했다. 이 중 태양광 발전 설비 용량은 12억 9,900만 kW로 16.3% 증가했고, 풍력 발전 설비 용량은 6억 9,300만 kW로 19.6% 증가했다.
2026년 09월 24일 16:51 (GMT+8)