Tender for EPC Energy Storage System Project of 600MW Wind Power Generation-Grid-Load-Storage in Hami, Xinjiang

게시됨: Apr 16, 2025 18:09
On April 15, China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. issued a tender announcement for the procurement of the energy storage system project of the EPC general contracting project for the 600MW wind power project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage. The current phase involves the construction of 60MW/120MWh, and the procurement scope includes containerized converter and step-up integrated units, 20-foot containerized ESS battery systems, energy management systems, video surveillance equipment, cables, copper busbars and their accessories, fire alarm and firefighting systems, HVAC systems, 3kV power cables and their accessories, 35kV power cables and their accessories, lighting and power systems, PVC pipes, hot-dip galvanized steel pipes and other pipe materials, as well as corresponding spare parts, special tools and instruments, on-site construction, installation, commissioning, testing, trial operation, acceptance, production training, technical documentation, and related packaging, transportation services, and technical services.

Tender Announcement for the Procurement of the Energy Storage System Project of the EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage

I. Tender Conditions
The EPC general contracting project for the 600MW wind power project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage (Tender Project No.: GDDLSJYJY_FGS_037642-HW-ZCNX00534-FGS_037642-2025-004) has been approved by the project approval/verification/filing authority. The project funding source is self-raised by the owner, and the bid inviter is China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. The project has met the tender conditions and is now open for public bidding.

II. Project Overview and Tender Scope
Project Scale: 600MW
Tender Content and Scope: This tender project is divided into 1 section, and this tender is for: Section (Package) Number Last Three Digits + Section Package Name: EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage
Section (Package) Content:
1. The bidder is responsible for the energy storage system project, including but not limited to the following parts: design, procurement, survey and design, construction, commissioning, acceptance, production training, etc.:
The bidder shall be responsible for the complete design of all equipment processes, electrical (including fire alarm systems), monitoring, energy storage power station (firefighting, drainage), paint insulation, all equipment (35kV collection line switches are not within the supply scope), facilities, material supply, construction, installation, commissioning, technical services, and production training for the energy storage power station and its auxiliary system areas, including but not limited to the following parts, the bidder's scope shall at least include the following:
1) Site ancillary facilities
2) Electrical system: The current phase involves the construction of 60MW/120MWh, connected to the 35kV switchgear interface of the collection station at the 35kV voltage level.
3) Control system: All necessary for the design, supply, and installation of the energy storage power station system, and connected to the main control system communication network, cooperating to complete the control logic design, configuration, and commissioning of the energy storage system project and the collection station.
4) Communication system: The communication power cabinet mainly contains UPS, EMU, switches, transformer measurement and control, and various power distribution outputs.
The power supply for the communication power cabinet adopts the self-power supply method of the PCS complete set device.
The power supply for communication monitoring, EMU, electromagnetic locks, transformer measurement and control, and switches is supplied through UPS uninterruptible power supply, with the UPS power configured according to the specific load situation, and the backup power duration is not less than 15 minutes.
Dual communication interfaces should be adopted, with control and monitoring separated.
The communication adopts a dual-loop wiring method: one loop for control and the other for monitoring. Including no less than 2 serial ports and 2 goose network ports provided by the PCS; no less than 2 network ports provided by the EMU device, meeting the access requirements of the collection station centralized control.
The bidder shall provide the bid inviter with the necessary spare parts, special tools, and lists required for installation, commissioning, and within the warranty period.
All product models, parameters, and subcontracting and externally purchased brands provided by the bidder must be approved by the bid inviter before procurement, and the procurement list shall be submitted to the bid inviter. The quantity of products provided by the bidder must meet the project needs.
2. Energy storage system project: containerized converter and step-up integrated units, 20-foot containerized ESS battery systems, energy management systems, video surveillance equipment, cables, copper busbars and their accessories, fire alarm and firefighting systems, HVAC systems, 3kV power cables and their accessories, 35kV power cables and their accessories, lighting and power systems, PVC pipes, hot-dip galvanized steel pipes and other pipe materials, as well as corresponding spare parts, special tools and instruments, on-site construction, installation, commissioning, testing, trial operation, acceptance, production training, technical documentation, and related packaging, transportation services, and technical services.
3. The bidder guarantees that the provided equipment is new, advanced, mature, complete, and safe and reliable, and the technical and economic performance of the equipment system meets the requirements of the second volume of technical specifications. The bidder shall provide a detailed supply list according to the second volume of technical specifications, but not limited to its equipment and devices. The bidder's detailed list shall sequentially specify the model, quantity, origin, producer, etc. For components necessary for the operation and construction of the complete set of equipment within the bidder's supply scope, even if not listed or insufficient in quantity in the contract annex, the bidder shall still supplement them free of charge during contract execution. The bidder's final supply shall meet the functional requirements of the process system, and the equipment increase caused by this shall not involve cost adjustment. All externally purchased component manufacturers must be confirmed by the bid inviter.

III. Bidder Qualification Requirements
Open Tender for the Energy Storage System Project of the EPC General Contracting Project for the 600MW Wind Power Project of Xinjiang Huatai New Materials Generation-Grid-Load-Storage:
3.1 The bidder shall be legally established and meet the following requirements:
① A corporate legal person registered and established within the territory of the People's Republic of China, with the ability to independently bear civil liabilities, and the ability to independently undertake procurement projects and perform contracts.
② Enterprises of the same legal person or affiliated enterprises (parent company, wholly-owned subsidiaries, and their holding companies) are only allowed to have one participate in this project's response, otherwise, all responses will be treated as invalid.
③ Not in a state of being ordered to suspend business, property being taken over, frozen, or bankrupt. Not listed in the national enterprise credit information publicity system (.cn) by the administrative authority for industry and commerce as a seriously illegal and dishonest enterprise; not listed in the "Credit China" website (.cn) by the Supreme People's Court as a dishonest person subject to enforcement.
④ Within the past three years, in the process of bidding activities, contract performance, and after-sales service, has not been publicly criticized by China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. and its parent companies, and has not been included in the supplier blacklist of China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. and its parent companies.
⑤ Other instructions: (1) Legal persons, other organizations, or individuals that have an interest relationship with the bid inviter that may affect the fairness of the bidding shall not participate in the bidding. (2) Different units with the same person in charge or with control or management relationships shall not participate in the bidding for the same section or the same bidding project without section division. Violation of the above two provisions will result in the invalidity of the relevant bids.
⑥ Have completed the supply of energy storage equipment from January 1, 2020, to the present.
⑦ Have qualifications related to the construction, installation, and commissioning services of power engineering projects, or the entrusted unit shall have qualifications related to the construction, installation, and commissioning services of energy storage equipment.
⑧ This project does not accept joint venture responses.
This project does not allow joint venture bidding.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[에너지 저장: 추넝, 중국 저장 기업 20곳이 남미를 주시하는 가운데 4건 계약 체결]
1시간 전
[에너지 저장: 추넝, 중국 저장 기업 20곳이 남미를 주시하는 가운데 4건 계약 체결]
더 보기
[에너지 저장: 추넝, 중국 저장 기업 20곳이 남미를 주시하는 가운데 4건 계약 체결]
[에너지 저장: 추넝, 중국 저장 기업 20곳이 남미를 주시하는 가운데 4건 계약 체결]
브라질 인터솔라 사우스 아메리카(8월 25~27일)에서 약 20개 중국 에너지저장 기업이 전시에 참가했다. 추넝뉴에너지는 4개 파트너와 계약을 체결했는데, 아르헨티나 Intermepro, 브라질 ION Energy 및 JSN Energia와 MOU를 맺었고, 윈디에너지와는 1.5GWh 셀 프레임워크 계약을 체결해 브라질 바이아주 첫 해외 저장공장에 셀을 공급하기로 했다. 취약한 전력망, 20.6%의 출력 제한율, 세계 두 번째로 높은 주거용 전기요금을 가진 브라질은 2026년 12월 라틴아메리카 최대 규모의 국가 저장 입찰(1차 약 18GW)을 시작할 예정이며, CATL, 트리나, 하이시움, CLOU, 고션, 그레이트파워가 현지 확장에 나서고 있다.
1시간 전
세계 최고 고도 660MW 초초임계 화력발전소의 고비율 고알칼리탄 혼소
2026년 9월 2일 10:35
세계 최고 고도 660MW 초초임계 화력발전소의 고비율 고알칼리탄 혼소
더 보기
세계 최고 고도 660MW 초초임계 화력발전소의 고비율 고알칼리탄 혼소
세계 최고 고도 660MW 초초임계 화력발전소의 고비율 고알칼리탄 혼소
8월 25일 18시, 국가전력투자그룹 칭하이성투자 3×660MW '소형기 대형기 교체' 화력발전 프로젝트 3호기가 168시간 전부하 시운전을 성공적으로 통과하여, 세계 최고 고도 660MW 초초임계 고비율 고알칼리탄 혼소 화력발전소의 전 용량 가동을 실현했다. 프로젝트가 전 용량 가동에 도달한 후, 총 설비 용량은 1980MW에 달하며, 연평균 안정적인 발전량은 80억 kWh 이상으로 칭하이성 전체의 전력 수요를 완전히 충족할 수 있다.
2026년 9월 2일 10:35
중국남방전력망에너지, 태양광 기업 2곳 지분 100% 양도 예정
2026년 9월 2일 10:35
중국남방전력망에너지, 태양광 기업 2곳 지분 100% 양도 예정
더 보기
중국남방전력망에너지, 태양광 기업 2곳 지분 100% 양도 예정
중국남방전력망에너지, 태양광 기업 2곳 지분 100% 양도 예정
8월 26일, 베이징 공공자원 거래 서비스 센터는 국유 지분 상장 양도 공고 두 건을 발표했다. 차이나 서던 파워 그리드 종합 에너지 유한공사(차이나 서던 파워 그리드 에너지)는 소유하고 있는 두 태양광 프로젝트 회사의 지분 100%를 양도할 계획이다. 이번 양도 대상은 두 개의 전액 출자 태양광 기업인 난뎬(청마이) 신에너지 기술 유한공사와 스쭝 상푸 이허 태양광 투자 유한공사이다.
2026년 9월 2일 10:35
Tender for EPC Energy Storage System Project of 600MW Wind Power Generation-Grid-Load-Storage in Hami, Xinjiang - Shanghai Metals Market (SMM)