Lishuwao Tailings Pond Successfully Completes Slurry Test Run in Luoyang Molybdenum's China Region

게시됨: Apr 14, 2025 10:59
On the morning of April 13, with the good news that "the power distribution system, hydraulic oil station, valves, and diaphragm pumps are operating normally, the pipeline is running stably, and all parameters are normal," the Lishuwao tailings pond in the China region of Luoyang Molybdenum successfully completed the slurry test run. Witnessed by all participating personnel, tailings continuously flowed into the reservoir area through an 8.6-kilometer pipeline, marking the official completion and commissioning of this key project with a total investment of 580 million yuan. It provides a safe and environmentally friendly new destination for the 5.47 million mt of tailings annually from the Sandaozhuang sector.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
On the morning of April 13, with the good news that "the power distrib - Shanghai Metals Market (SMM)