According to the announcement, the total scale of the 100MW/400MWh shared ESS power station project in Mishan City, Heilongjiang Province is 100MW/400MWh. The project construction unit is Mishan Zekai, a wholly-owned subsidiary of the company. The project is located in Mishan City, Heilongjiang Province.
The project is expected to build a 400MWh ESS power station, accounting for 10% of the 1 million kW new energy capacity, with a power storage capacity of up to 4 hours. The project is a grid-side standalone ESS demonstration project (grid-connected type). It includes the construction of a new 220kV ESS power station and the connection of a 220kV transmission line to the Mishan 220kV substation.
To configure the energy storage system, the project plans to adopt the most mature and stable LFP + ESS battery system currently available in the market. The construction period of the entire project is approximately 6 months.