Temporary factors led to a weakening in polysilicon demand, while module inventory remained at low levels. [SMM Silicon-Based PV Morning Meeting Summary]

게시됨: Mar 31, 2025 09:00
SMM Silicon-Based PV Morning Meeting Summary: Temporary Factors Weaken Polysilicon Demand, Module Inventory Remains Low. Over the weekend, the price of N-type recharging polysilicon was 39-45 yuan/kg, and the price of N-type dense polysilicon was 38-42 yuan/kg. Polysilicon prices remained temporarily stable, with month-end transactions gradually unfolding in the market. However, the negotiation atmosphere was weak, and price increases faced resistance. The earthquake in Myanmar may significantly impact wafer production in Yunnan in April, and downstream demand may fall short of expectations.

SMM March 31 News:

Silicon Metal

Prices

Last week, spot prices in the silicon metal market continued to decline and consolidate, with above-standard #553 silicon in east China ranging from 10,100-10,300 yuan/mt. The main futures contract saw a slight upward correction due to news of production cuts on the supply side. In the short term, spot prices for silicon metal are expected to fluctuate rangebound.

Production

Some capacity at major northern plants was gradually reduced or halted today, and silicon metal supply is expected to decrease WoW.

Inventory

Social inventory: According to SMM, the national social inventory of silicon metal totaled 604,000 mt on March 28, up 13,000 mt WoW. This includes 139,000 mt in general social warehouses, up 4,000 mt WoW, and 465,000 mt in social delivery warehouses (including unregistered warrants and spot cargo), up 9,000 mt WoW.

Polysilicon

Prices

At the end of the week, prices for N-type recharging polysilicon were 39-45 yuan/kg, and N-type dense polysilicon was 38-42 yuan/kg. Polysilicon prices remained stable temporarily, with month-end transactions gradually unfolding, but the negotiation atmosphere was weak, and price increases faced resistance. The earthquake in Myanmar may significantly impact wafer production in Yunnan in April, and downstream demand may fall short of expectations.

Production

In April, there will be some new capacity additions and production increases at certain manufacturers. Polysilicon production is expected to increase slightly, but wafer production may fall short of expectations, leading to a restructuring of polysilicon supply and demand.

Inventory

This week, polysilicon market circulation was limited, and inventory changes were minimal.

Module

Prices

In the current module market, distributed N-type 182 modules are priced around 0.768-0.778 yuan/W, with the average price up 0.004 yuan/W from last Friday. Distributed N-type 210 modules are priced at 0.773-0.783 yuan/W, with the average price up 0.003 yuan/W from last Friday. Centralized N-type 182 modules are priced at 0.704-0.722 yuan/W, and centralized N-type 210 modules are priced at 0.719-0.737 yuan/W. Last week, the upward momentum in module prices weakened significantly.

Production

Most companies raised their operating rates in March, up 35% MoM. Affected by the rush for installations, module scheduled production in April continues to show a growth trend.

Inventory

As April approaches, demand for distributed module orders is gradually cooling, but major manufacturers have mostly completed their overall order arrangements for April, and inventory remains relatively low.

High-Purity Quartz Sand

Prices

Currently, domestic inner layer sand is priced at 60,000-75,000 yuan/mt, middle layer sand at 30,000-45,000 yuan/mt, and outer layer sand at 20,000-25,000 yuan/mt. Sand prices have remained stable recently, with no significant purchasing fluctuations in the market, and upstream and downstream companies remain in a deadlock.

Production

Domestic sand companies' operating rates rose in March compared to February, with some companies slightly increasing their rates due to rising end-use demand.

Inventory

Sand companies' inventories remain high, and crucible procurement volume is limited.

PV Glass

Prices

3.2mm single-layer coating: 3.2mm single-layer coating PV glass is quoted at 22-23 yuan/m², and actual transaction prices are expected to materialize this week.

3.2mm double-layer coating: 3.2mm double-layer coating PV glass is quoted at 23-24 yuan/m², and actual transaction prices are expected to materialize this week.

2.0mm single-layer coating: 2.0mm single-layer coating PV glass is quoted at 13.5-14 yuan/m², and actual transaction prices are expected to materialize this week.

2.0mm double-layer coating: 2.0mm double-layer coating PV glass is quoted at 14.5-15 yuan/m², and actual transaction prices are expected to materialize this week.

Production

Domestic glass production increased significantly in March, and scheduled production in April is expected to continue rising.

Inventory

This week, domestic glass companies' inventories declined, but the pace of decline was limited. With high module scheduled production demand in April, glass shortages are increasing, and days of inventories continue to decline.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
1시간 전
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
더 보기
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
방글라데시 전력부는 자국 순계량 제도에 따라 적격 옥상 태양광 시스템의 잉여 전력에 대해 kWh당 10.50타카(0.086달러)의 요금을 발표했으며, 2030년 2월 28일까지 3년간 유효하다. 배터리 저장장치를 갖춘 옥상 태양광 시스템의 최대 발전 비용은 kWh당 8타카로 설정되었으며, 정부는 20%의 이윤과 11.25%의 프리미엄을 추가했다. 2027년 2월 28일까지 설치되어 2025년 순계량 지침에 따라 적격한 시스템은 인센티브 요금을 받을 수 있다. 정부는 여름철 성수기 수요 시 3GW를 초과하는 일일 전력 부족 문제를 해결하기 위해 내년 여름까지 순계량을 통해 최소 5GW의 태양광 용량을 설치하는 것을 목표로 하고 있다.
1시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
1시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
더 보기
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
프론티어 에너지는 서호주 남서부에 위치한 와루나 재생에너지 프로젝트 1단계의 모든 주요 계약을 체결했다고 발표했다. 이 프로젝트는 132MW 규모의 태양광 발전 시설과 81.5MW/565MWh 규모의 배터리 에너지 저장 시스템으로 구성된다. 론지가 650W 및 655W 정격의 태양광 패널 20만 장 이상을 공급하고, 트리나솔라가 20년 보증 및 장기 서비스 계약에 따라 배터리 유닛을 공급하며, SMA가 인버터를 제공한다. 프로젝트 예산은 약 3억 1천만 달러이며, 이번 달에 착공하여 2028년 첫 전력 생산을 목표로 한다. 향후 태양광 1GW 및 저장 용량 660MW 규모로 확장할 계획이다.
1시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
1시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
더 보기
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
말레이시아 에너지전환·수자원전환부는 7월에 LSS6 대규모 태양광 입찰을 시작하여 총 2,500MW의 태양광 용량과 1,250MW의 배터리 에너지 저장장치를 결합하고, 부미푸테라 기업을 위해 150MW를 별도 배정했다. 이는 말레이시아 사상 최대 규모의 유틸리티급 태양광 입찰이자, 태양광-ESS 하이브리드 개발을 의무화한 첫 LSS 라운드이다. 이 프로그램은 약 130억~150억 링깃(약 32억~37억 달러)의 민간 투자를 유치할 것으로 예상되며, 프로젝트는 단계적으로 준공되어 2029년 12월 31일까지 완전 상업 운전을 목표로 한다.
1시간 전
Temporary factors led to a weakening in polysilicon demand, while module inventory remained at low levels. [SMM Silicon-Based PV Morning Meeting Summary] - Shanghai Metals Market (SMM)