Rich Ore Found in Drilling at Chile's Valeriano Copper-Gold Mine

게시됨: Mar 21, 2025 10:39
[High-Grade Ore Found in Drilling at Valeriano Copper-Gold Mine in Chile] According to Mining.com, ATEX Resources Inc. announced that drilling at the Valeriano copper-gold mine in Chile's Atacama Region encountered ore with a copper grade as high as 2.2%, the highest grade found so far at this porphyry copper deposit.

According to Mining.com, ATEX Resources Inc. announced that drilling at its Valeriano copper-gold project in Chile's Atacama region encountered a high-grade ore body with a copper grade as high as 2.2%, the highest grade found so far in this porphyry copper deposit.

On Tuesday, the company stated that drill hole ATXD25A intersected 30 meters of mineralization at a depth of 1,892 meters, with a copper grade of 2.21%, gold 3.17 g/mt, silver 15.1 g/mt, and molybdenum 0.0003%. Additionally, at a depth of 1,896 meters, it intersected 16 meters of mineralization, with a copper grade of 3.04%, gold 4.82 g/mt, silver 21.1 g/mt, and molybdenum 0.0005%.

Ben Pullinger, President and CEO of the company, said, "Valeriano continues to deliver high-grade intercepts, setting new records for the project, which is getting better and better."

ATXD25A extended the high-grade porphyry ore body by 1,000 meters, still uncontrolled, according to Pullinger.

Resource Update Imminent

On Tuesday, BMO Capital Markets analyst Rene Cartier noted in an investment alert that ATEX's Phase V drilling has consistently reported good results, which bodes well for expanding the resource base in H2. At that time, the inferred resources are expected to be upgraded to indicated resources.

The company announced in 2023 that the inferred mineral resource was 1.4 billion mt, with a copper grade of 0.49%, gold 0.21 g/mt, silver 0.99 g/mt, and molybdenum 0.00624%. In terms of metal content, this equates to 7 million mt of copper, 9.5 million ounces of gold, 46.1 million ounces of silver, and 90,100 mt of molybdenum.

Agnico Eagle Investment

ATEX's Phase V drilling program received C$55 million in funding from Agnico Eagle Mines last October, giving the latter a 13% stake in ATEX.

The high-grade section of ATXD25A is located 1,000 meters below the B2B zone of Valeriano, and the ATXD25B hole will test this new target. Currently, two drills are operating in the B2B zone.

Another significant intersection at Valeriano was in the ATXD16B hole, which intersected 780 meters of mineralization at a depth of 1,044 meters, with a copper grade of 0.56%, gold 0.23 g/mt, silver 0.9 g/mt, and molybdenum 0.0090%. This includes a 232-meter section with a copper grade of 0.75%, gold 0.31 g/mt, silver 1.2 g/mt, and molybdenum 0.0088%. The hole also extended the high-grade porphyry ore body 120 meters to the southeast without penetrating it.

The ATXD23A hole intersected 1,220 meters of mineralization at a depth of 822 meters, with a copper grade of 0.66%, gold 0.28 g/mt, silver 1.9 g/mt, and molybdenum 0.013%. This includes a 22-meter section with a copper grade of 2.35%, gold 1.31 g/mt, silver 8.6 g/mt, and molybdenum 0.0029%.

To date, 9,675 meters have been completed in five holes of the Phase V drilling, with another five holes currently in progress. The Valeriano project covers 61.3 square kilometers and is located 200 kilometers southeast of Puerto Vásquez, near the border between Chile and Argentina.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
1분 전
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
더 보기
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Evaluates 43% Mill Expansion at McIlvenna Bay as Mine Nears Commercial Production
Eldorado Gold is evaluating a 43% expansion of processing capacity at the McIlvenna Bay copper-zinc mine in Saskatchewan, from 4,900 tpd to about 7,000 tpd, alongside a potential silver-lead circuit. More than 400,000 tonnes of material are available for processing as the operation ramps toward commercial production in Q3 2026. The existing feasibility plan targets average life-of-mine copper production of around 41 million lb (18.6kt) per year.
1분 전
원앤원, 신규 필리핀 금속 회수 라인용 원료 2,000톤 이상 확보
2분 전
원앤원, 신규 필리핀 금속 회수 라인용 원료 2,000톤 이상 확보
더 보기
원앤원, 신규 필리핀 금속 회수 라인용 원료 2,000톤 이상 확보
원앤원, 신규 필리핀 금속 회수 라인용 원료 2,000톤 이상 확보
원앤원 그린 테크놀로지스는 필리핀의 새로운 금속 회수 라인을 위해 구리 함유, 니켈 및 전자 슬러지를 포함한 2,000톤 이상의 원료를 확보했습니다. 장비 설치가 진행 중이며 2026년 말 이전 생산을 목표로 하고 있습니다. 이 시설은 산업 및 전자 폐기물에서 구리, 니켈, 금, 은을 회수하여 복합 2차 금속 원료에 대한 새로운 현지 처리 역량을 추가할 것입니다.
2분 전
구리 가격, 공급 소폭 완화·수요 부진 속 압박 받으며 횡보 [SMM 구리 모닝 미팅 요약]
12분 전
구리 가격, 공급 소폭 완화·수요 부진 속 압박 받으며 횡보 [SMM 구리 모닝 미팅 요약]
더 보기
구리 가격, 공급 소폭 완화·수요 부진 속 압박 받으며 횡보 [SMM 구리 모닝 미팅 요약]
구리 가격, 공급 소폭 완화·수요 부진 속 압박 받으며 횡보 [SMM 구리 모닝 미팅 요약]
SMM 모닝 요약: 간밤 LME 구리는 톤당 14,127달러에 개장해 장 초반 톤당 14,102.5달러까지 하락한 뒤, 가격 중심이 곧바로 상승해 톤당 14,292.5달러를 터치했으며, 이후 하락세로 전환해 톤당 14,236.5달러에 마감하며 0.31% 상승했다. 거래량은 22,700롯, 미결제약정은 268,600롯으로 전 거래일 대비 3,229롯 증가해 매수 포지션 구축이 주도했다. 간밤 SHFE 구리 최다거래 2610 계약은 톤당 108,500위안에 개장해 장 초반 톤당 108,310위안까지 하락한 뒤, 가격 중심이 곧바로 상승해 톤당 108,760위안을 터치했으며, 이후 하락세로 전환해 톤당 108,390위안에 마감하며 0.26% 상승했다. 거래량은 28,300롯, 미결제약정은 206,000롯으로 전 거래일 대비 876롯 감소해 매도 포지션 청산이 주도했다.
12분 전
Rich Ore Found in Drilling at Chile's Valeriano Copper-Gold Mine - Shanghai Metals Market (SMM)