[Procurement of Operation and Maintenance Services for the 103MW/206MWh Shared ESS Power Station in Pingguo, Baise, Guangxi, 2025-2027] On March 12, the announcement for the competitive selection of the procurement of operation and maintenance services for the 103MW/206MWh shared ESS power station in Pingguo, Baise, Guangxi, 2025-2027, was released. The bid inviter for the project is Chongqing Liangjiang Comprehensive Energy Service Co., Ltd., and the owner is Guangxi Pingguo Yudian Energy Technology Co., Ltd., a subsidiary of Chongqing Liangjiang Comprehensive Energy Service Co., Ltd.
The 103MW/206MWh shared ESS power station project in Pingguo, Baise, Guangxi (dispatch name: Yuxia ESS Station) is located in Boli Village, Pingguo City, Baise, Guangxi, in the southern part of the Pingguo County Intelligent Manufacturing Industrial Park. It covers an area of 37.6 mu, with a capacity of 103 megawatts/206 megawatt hours.
![[SMM 에너지저장 배터리 셀 시장 주간 리뷰 9.3] 동박 공급 부족으로 9월 생산 일정 제약, 에너지저장 배터리 셀 가격 견조 유지](https://imgqn.smm.cn/usercenter/tKgKv20251217171725.png)
![마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]](https://imgqn.smm.cn/usercenter/EutUV20251217171724.jpeg)

