From 1 to 100! The Story Behind Sichuan's First Lithium Mine Exceeding 1 Million mt

게시됨: Mar 6, 2025 14:24
From 1 to 100! The Discovery of Sichuan's First Lithium Mine with Over 1 Million mt of Resources Recently, the Dangba Lithium Mine in Maerkang City, Sichuan Province, was approved by the Ministry of Natural Resources for its mineral resource reserve evaluation, adding 440,000 mt of lithium oxide resources. The total measured lithium oxide resources have reached 1.1207 million mt, making it Sichuan's first granite pegmatite-type lithium mine with over 1 million mt of lithium oxide resources. It is also the largest granite pegmatite-type lithium mine with measured resources in Asia to date. (Chengdu Planning and Natural Resources)

Recently, the Dangba lithium mine in Maerkang City, Sichuan Province, passed the mineral resource reserve review and filing by the Ministry of Natural Resources, adding 440,000 mt of lithium oxide resources. The cumulative measured lithium oxide resources have reached 1.1207 million mt, making it the first granite pegmatite-type lithium deposit in Sichuan with over 1 million mt of lithium oxide resources. It is also the largest granite pegmatite-type lithium deposit with measured resources in Asia to date.

On the global lithium mine map,

Sichuan shines brightly.

From Jiajika and Maigitang in Yajiang County

to Ke'eryin and Lijiagou,

each deposit discovery has its unique story.

What journey has the exploration of the Dangba lithium mine in Maerkang gone through?

 

From Less Than 10,000 mt to Over 1 Million mt

The Dangba mining area

is located in the Ke'eryin region of Aba Prefecture. Less than 10,000 mt was the measured lithium oxide resource in the Dangba mining area in 2007. Today, it is a well-known rare metal mining field in China, primarily focused on lithium.

The Lijiagou spodumene deposit,

not far from the Dangba deposit, is also located in the Ke'eryin region. At that time, its exploration also faced significant challenges and fell far short of expectations. However, the prospectors did not give up. A few years later, the Sichuan Institute of Comprehensive Geological Survey, a subsidiary of the Sichuan Geological Survey Institute, opened the "door" to lithium resources, achieving a major breakthrough in Lijiagou by identifying a super-large-scale deposit. This significant breakthrough also boosted confidence in finding lithium on a larger scale.

In 2011,

the Sichuan Institute of Comprehensive Geological Survey

incorporated the mining and exploration rights of the Dangba mining area

into an integrated exploration effort.

These two deposits in the Ke'eryin region share similarities ➤ both face challenges such as thick surface soil cover, limited exposure of ore bodies, and difficulty in understanding their distribution patterns. Therefore, during the exploration of the Dangba mining area, the exploration techniques and scientific theories used in Lijiagou were applied and practiced. However, this does not mean that the successful experience of Lijiagou could be directly replicated like an assembly line.

"Each deposit is unique and has its complexities. For example, the lithium ore in Lijiagou is clustered in a 'parallel' pattern, while the ore bodies in Dangba are clustered like a 'wild goose formation,'"

explained Tang Wenchun, Chief Scientist of the Sichuan Geological Survey Institute.

Since 2011,

the exploration of the Dangba lithium mine has accumulated an investment of over 170 million yuan, with more than 40,000 meters of drilling work completed.

After more than a decade of exploration,

marked by challenges and discoveries,

a "progressive breakthrough" trilogy has been written.

↓↓↓

In 2014, the Dangba mining area achieved its first phase of exploration breakthrough, submitting over 660,000 mt of lithium oxide resources.

Three years later, the second phase of exploration breakthrough was achieved, adding nearly 250,000 mt of lithium oxide resource reserves.

Subsequently, through continuous deep exploration and blind target identification, over 1.12 million mt of lithium oxide resource reserves were identified, marking the third phase of exploration breakthrough.

"We spend six to seven months a year in the field. Each increase in reserves is a process of deepening understanding,"

said Senior Geological Engineer Jian Li, who has been involved in the exploration of the Dangba mining area from the beginning.

Exploration: Bold Assumptions, Careful Verification

200 Million Years Ago,

magma activity deep within the Earth formed pegmatite.

This type of rock, hidden deep within the strata,

is relatively small in scale, varies in shape, and is highly scattered.

Moreover, most of it does not contain lithium ore.

"This requires a certain level of imagination and thinking to discover the mineralization patterns, then deploy appropriate methods and technologies for verification—essentially bold assumptions and careful verification," said Tang Wenchun.

Through the comprehensive application and collaboration of

geophysical, geochemical, and remote sensing methods,

combined with mineral deposit geochemistry

and mineralogy research methods,

the exploration team conducted in-depth studies on the mineralization conditions and enrichment patterns in the mining area.

After pinpointing the concealed locations of thick and large ore bodies, they used geological engineering methods such as drilling to verify and control the ore bodies.

 

"Simply put, we needed to determine what factors controlled the pegmatite and pegmatite ore bodies in the Dangba mining area, what their distribution patterns were, and how to predict the shapes of deep ore bodies,"

explained Tang Wenchun. This is a multidisciplinary collaborative process involving over 10 subjects in comprehensive research, ultimately leading to new insights into the deposits here. The shapes and spatial positions of the concealed ore bodies gradually became clear.

From the cross-sectional view of the mining area, the ore veins being sought resemble a "thin ribbon," irregularly extending from the surface to the deep crust, akin to "finding a needle in a haystack."

After discovering traces of the ore veins,

the next step was to

set up drill holes

to observe the "ore" through a narrow scope.

The entire work area has an elevation difference of 2,200 meters. Technical personnel climbed within this area, setting up over 140 drill holes. Over more than a decade, they drilled a cumulative depth of over 40,000 meters. At peak times, more than 100 professional technical personnel and drilling technicians were working on-site.

To meet the planned schedule, the technical personnel worked as late as December, when the plateau had already turned into a silver-white world. Water supply pipes outside the camp had frozen into ice columns, and roads were sealed by black ice. To replenish living supplies, staff had to hike tens of kilometers through the mountains.

"Ultimately, 11 lithium ore bodies were delineated, with one main ore body accounting for over 80% of the resources,"

said Senior Geological Engineer Yunhua Cai, who was responsible for field operations. During the third phase of exploration, the exploration team continuously innovated exploration approaches, applying advanced hydraulic portable drilling technology to implement green exploration techniques such as multi-hole drilling from a single base and multi-branch drilling from a single hole. These innovations solved technical challenges such as significant deformation and deviation of deep drill holes from the ore bodies, greatly improving exploration efficiency.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
Ecora의 Voisey's Bay 코발트 지분, 지하 광산 증산 완료 임박으로 상반기 전년 대비 90% 증가
1시간 전
Ecora의 Voisey's Bay 코발트 지분, 지하 광산 증산 완료 임박으로 상반기 전년 대비 90% 증가
더 보기
Ecora의 Voisey's Bay 코발트 지분, 지하 광산 증산 완료 임박으로 상반기 전년 대비 90% 증가
Ecora의 Voisey's Bay 코발트 지분, 지하 광산 증산 완료 임박으로 상반기 전년 대비 90% 증가
에코라 로열티스가 9월 2일 발표한 2026년 중간 실적에 따르면, 회사는 올해 상반기 보이시스 베이 코발트 스트림을 통해 266톤의 코발트를 수취했다. 이는 2025년 같은 기간의 140톤 대비 약 90% 증가한 수치다. 에코라는 보이시스 베이의 지하 채굴 작업 증산이 현재 실질적으로 완료되었다고 밝혔다. 코발트 물량 증가와 가격 강세에 힘입어, 스트림 비용 차감 후 프로젝트 포트폴리오 기여도는 상반기에 1,350만 달러로 전년 동기 대비 230% 증가했으며, 평균 실현 코발트 가격은 전년 동기 파운드당 16.5달러에서 28.4달러로 상승했다. 한편, 베일 베이스 메탈스는 보이시스 베이 선광장의 처리 능력을 연간 약 280만 톤에서 380만 톤으로 확장하는 방안을 검토 중이다. 관련 예비 타당성 조사가 진행 중이며, 최종 투자 결정은 2028년경을 목표로 하고 있다. 또한 이 프로젝트는 2026년에 지하 및 지표 시추를 계획하여 광산 계획을 최적화하고, 자원 확장을 지원하며, 광산 수명을 연장할 가능성을 모색하고 있다. 에코라는 또한 보이시스 베이 선광장의 정기 보수가 3분기에, 롱 하버 정련소의 정기 보수가 4분기에 예정되어 있다고 밝혔다.
1시간 전
SMM 데일리 리뷰: 9월 2일 탄산리튬 현물 가격 하락
17시간 전
SMM 데일리 리뷰: 9월 2일 탄산리튬 현물 가격 하락
더 보기
SMM 데일리 리뷰: 9월 2일 탄산리튬 현물 가격 하락
SMM 데일리 리뷰: 9월 2일 탄산리튬 현물 가격 하락
오늘 SMM 전지급 탄산리튬 현물 가격은 전 거래일 대비 소폭 하락했다. 탄산리튬 2701 계약은 오늘 157,000위안/톤에 낮게 개장한 후 하락세를 보였다. 오전 장중 156,000~157,000위안 구간에서 약세 흐름을 보였으며, 장중 고점은 157,800위안/톤이었다. 정오 무렵 153,200위안/톤까지 급락하며 장중 신저가를 기록했다. 정오 전후로 154,000~156,000위안 구간에서 등락을 반복했다. 오후 장에서는 매수 세력이 일시적으로 가격을 끌어올렸으나 평균 가격선을 돌파하지 못했다. 장 후반 다시 약세를 보이며 결국 3.2% 하락한 154,800위안/톤에 마감했고, 미결제약정은 9,123계약 감소했다. 현물 시장에서는 하류 업체들이 필요에 따라 저가 매수에 나섰다. 155,000위안/톤 이하에서는 하류의 현물 주문 매수 의향이 계속 회복되었다. 공급 측면에서는 가격이 하락함에 따라 현물 주문 판매 의향이 여전히 약했으며, 일부 리튬 화학 공장은 가격을 고수하며 판매를 보류했다. 전반적으로 시장 문의와 실제 거래는 비교적 활발했다.
17시간 전
[SMM 단신] Albemarle, Wodgina 스포듀민 정광 경매 완료... CIF 중국 기준 US$2,307/dmt
20시간 전
[SMM 단신] Albemarle, Wodgina 스포듀민 정광 경매 완료... CIF 중국 기준 US$2,307/dmt
더 보기
[SMM 단신] Albemarle, Wodgina 스포듀민 정광 경매 완료... CIF 중국 기준 US$2,307/dmt
[SMM 단신] Albemarle, Wodgina 스포듀민 정광 경매 완료... CIF 중국 기준 US$2,307/dmt
SMM 9월 2일: Albemarle는 오늘 자사 Wodgina 광산의 스포듀민 정광에 대한 새로운 입찰을 완료했습니다. 입찰 물량은 15,840건조톤이며, ±10%의 수량 허용 오차가 적용됩니다. 최종 거래 가격은 US$2,307/dmt CIF 중국으로 보고되었으며, Li₂O 6% 기준으로 표준화되었습니다. 화물 가격은 중국 전장항 CIF 기준이며, VAT는 제외됩니다. 결제 조건은 선불 현금 결제로, 9월 8일까지 대금 수령이 완료되어야 합니다.
20시간 전
From 1 to 100! The Story Behind Sichuan's First Lithium Mine Exceeding 1 Million mt - Shanghai Metals Market (SMM)