Silicon Wafer Prices Rise, Solar Cell Production Schedule Increases by Approximately 19% [SMM Silicon-Based PV Morning Meeting Summary]

게시됨: Feb 28, 2025 09:15
[SMM Silicon-Based PV Morning Meeting Summary]: This week, silicon wafer production schedules fell short of expectations, with top-tier enterprises leading the price increase. In March, battery supply saw a significant increase, with production schedules rising by approximately 19%.

 

Silica

Prices

This week, silica prices remained stable. The demand in the silicon metal market continued to be sluggish. Some silicon plants in south-west China recently reported that the resumption time during this year's rainy season remains uncertain, and there are no plans for raw material inventory replenishment. Therefore, the demand for silica is mainly driven by operating silicon plants in northern China, with overall demand remaining low. Currently, the mine-mouth price for low-grade silica in Yunnan is 330-350 yuan/mt. The mine-mouth price for high-grade silica is 350-380 yuan/mt in Inner Mongolia, 400-450 yuan/mt in Hubei, and 430-460 yuan/mt in Jiangxi.

Production

The overall supply of silica at mine-mouth remains relatively ample.

Demand

Top-tier silicon plants downstream generally have supplementary silica resources, while small and medium-sized silicon plants are operating at low levels. Sentiment among silicon plants in south-west China is pessimistic, with many production resumption plans during the rainy season remaining unclear, and raw material procurement demand temporarily on hold.

Silicon Metal

Prices

This week, spot silicon metal prices continued to decline slightly. In east China, the delivery-to-factory price for above-standard #553 silicon was 10,600-10,700 yuan/mt, with the average price down by 100 yuan/mt WoW. The price for #441 silicon was 11,000-11,200 yuan/mt, also down by 100 yuan/mt WoW. Yesterday, the most-traded SI2505 futures contract for silicon metal fell further, with the low point dropping below 10,300 yuan/mt. The silicon market's transaction sentiment remained weak, and prices stayed under pressure.

Production:

In late February, new production resumption in northern regions led to a slight increase in the overall operating rate of silicon metal. With production release, the total supply of silicon metal in March is expected to increase.

Inventory

Social Inventory: According to SMM statistics, as of February 21, the social inventory of silicon metal in some regions of China totaled 546,000 mt, up by 2,000 mt WoW. Among this, general social warehouses held 50,000 mt, up by 1,000 mt WoW, while social delivery warehouses held 396,000 mt (including unregistered warehouse warrants and spot cargo), up by 1,000 mt WoW. (This inventory data excludes regions such as Inner Mongolia and Ningxia.)

Silicon Wafer

Prices

The market price for N-type 18X silicon wafers was 1.18-1.2 yuan/piece, while the price for N-type 210RN silicon wafers was 1.3-1.35 yuan/piece. Silicon wafer prices increased, with top-tier enterprises leading the price adjustments, which will officially take effect next week.

Production

In February, silicon wafer production continued to increase. However, March production schedules are expected to be significantly impacted by industry self-discipline, with production schedules falling short of market supply and demand expectations. The MoM change in production schedules from February is expected to be limited.

Inventory

Recently, some transactions for silicon wafers have been completed, with an increase in order signing. Inventory saw a slight pullback.

Solar Cell

Prices

The price for high-efficiency PERC182 solar cells (efficiency of 23.2% and above) was 0.325-0.33 yuan/W, with high-end prices slightly declining. There were no transactions in the PERC210 solar cell market. The price for Topcon183 solar cells (efficiency of 25% and above) was around 0.29 yuan/W, while Topcon210RN solar cells were priced at 0.29 yuan/W, and Topcon210 solar cells were priced at 0.29-0.295 yuan/W, with prices slightly increasing. The mainstream price for HJT210 half-cell products was 0.36-0.38 yuan/W, with prices remaining stable.

Production

In March, the supply side of solar cells is expected to increase significantly, with production schedules rising by approximately 19%, mainly driven by growing demand.

Inventory

Following the confirmation of new orders, solar cell shipments began to grow, and inventory showed a downward trend.

PV Film

Prices

PV-Grade EVA: The transaction price for PV-grade EVA was 11,300-11,650 yuan/mt. The domestic delivery-to-factory price for PV-grade POE was approximately 12,000-14,000 yuan/mt, with POE prices remaining stable.

PV Film

Currently, the mainstream price for 420g transparent EVA film is 5.29-5.46 yuan/m², for 420g white EVA film is 5.67-6.05 yuan/m², for 380g EPE film is 5.79-5.89 yuan/m², and for 380g POE film is 6.84-7.22 yuan/m².

Production

In February, the planned production of PV-grade EVA was approximately 1.1 million mt, while the planned production of PV film was approximately 340 million m².

Inventory

Currently, petrochemical enterprises have low inventory levels. With the increase in module production, the demand for EVA is expected to grow significantly. On the supply side, due to maintenance and planned production shifts, supply is expected to decrease, keeping inventory levels low.

 

 

 

 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
1시간 전
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
더 보기
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
방글라데시 전력부는 자국 순계량 제도에 따라 적격 옥상 태양광 시스템의 잉여 전력에 대해 kWh당 10.50타카(0.086달러)의 요금을 발표했으며, 2030년 2월 28일까지 3년간 유효하다. 배터리 저장장치를 갖춘 옥상 태양광 시스템의 최대 발전 비용은 kWh당 8타카로 설정되었으며, 정부는 20%의 이윤과 11.25%의 프리미엄을 추가했다. 2027년 2월 28일까지 설치되어 2025년 순계량 지침에 따라 적격한 시스템은 인센티브 요금을 받을 수 있다. 정부는 여름철 성수기 수요 시 3GW를 초과하는 일일 전력 부족 문제를 해결하기 위해 내년 여름까지 순계량을 통해 최소 5GW의 태양광 용량을 설치하는 것을 목표로 하고 있다.
1시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
1시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
더 보기
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
프론티어 에너지는 서호주 남서부에 위치한 와루나 재생에너지 프로젝트 1단계의 모든 주요 계약을 체결했다고 발표했다. 이 프로젝트는 132MW 규모의 태양광 발전 시설과 81.5MW/565MWh 규모의 배터리 에너지 저장 시스템으로 구성된다. 론지가 650W 및 655W 정격의 태양광 패널 20만 장 이상을 공급하고, 트리나솔라가 20년 보증 및 장기 서비스 계약에 따라 배터리 유닛을 공급하며, SMA가 인버터를 제공한다. 프로젝트 예산은 약 3억 1천만 달러이며, 이번 달에 착공하여 2028년 첫 전력 생산을 목표로 한다. 향후 태양광 1GW 및 저장 용량 660MW 규모로 확장할 계획이다.
1시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
1시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
더 보기
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
말레이시아 에너지전환·수자원전환부는 7월에 LSS6 대규모 태양광 입찰을 시작하여 총 2,500MW의 태양광 용량과 1,250MW의 배터리 에너지 저장장치를 결합하고, 부미푸테라 기업을 위해 150MW를 별도 배정했다. 이는 말레이시아 사상 최대 규모의 유틸리티급 태양광 입찰이자, 태양광-ESS 하이브리드 개발을 의무화한 첫 LSS 라운드이다. 이 프로그램은 약 130억~150억 링깃(약 32억~37억 달러)의 민간 투자를 유치할 것으로 예상되며, 프로젝트는 단계적으로 준공되어 2029년 12월 31일까지 완전 상업 운전을 목표로 한다.
1시간 전