I. Requirements for Project Application

  1. Technological Breakthroughs and Independent Intellectual Property Rights:
    • The applied projects should represent major technological breakthroughs achieved domestically for the first time, possess independent intellectual property rights, and involve key technical equipment in the energy sector that has not yet achieved large-scale market performance.
    • This includes the first three sets or batches of complete equipment, whole-machine equipment, core components, control systems, basic materials, software systems, etc.
  2. Key Areas:
    • The applied projects should aim to ensure national energy security, support the goals of carbon peaking and carbon neutrality, and contribute to the construction of a new-type energy system.
    • The focus should be on advanced renewable energy, new-type power systems, safe and efficient nuclear energy, green and efficient development and utilisation of fossil energy, new-type ESS, pumped storage, hydrogen energy and its comprehensive utilisation, digitalisation and intelligence of energy systems, energy conservation, and efficiency improvement.
  3. Engineering Application Conditions:
    • The technical equipment of the applied projects should have been developed and be ready for engineering application.
    • The supporting projects should have fulfilled the preconditions for construction, be capable of signing formal supply contracts within one year, and commence construction within two years, with a controllable construction period.
  4. Encouraged Technical Equipment:
    • Encouragement is given to technical equipment such as gas turbines, key components, basic materials, and specialised software to promote technological breakthroughs and demonstrations through the application of the first set, filling gaps in related fields and gradually enhancing the level of independent controllability.

II. Application Methods and Requirements

  1. Application Entities:
    • In principle, the first set of major technical equipment in the energy sector should be applied for by the user unit leading a joint application with the development unit.
    • For technical equipment without a determined supporting project, the development unit may apply based on the technological breakthroughs of the equipment.
  2. Application Materials and Submission:
    • The applying unit must submit the attachments listed in the "Application Report for the First Set of Major Technical Equipment in the Energy Sector" as required.
    • The application materials must include one paper copy and one electronic copy, with the electronic copy containing both WORD and PDF scanned documents, recorded on a CD, with each project not exceeding 30 MB.
  3. Application Process and Timeline:
    • The energy authorities of each prefecture-level city are responsible for organising the application work in their respective areas. Each city may submit no more than five projects, which should be reviewed and summarised before being submitted to the Zhejiang Provincial Energy Bureau.
    • Projects applied for by central state-owned enterprise groups must include a support letter from the energy authority of the prefecture-level city where the supporting project is located and will not count towards the local quota.
    • Ningbo, as a separately listed city, will organise its own review and application process, with relevant information simultaneously reported to the Provincial Energy Bureau.
    • Please send the recommendation letter and application materials to the Zhejiang Provincial Energy Bureau via China Post EMS by March 10, 2025.
  4. Other Requirements:
    • Applications should be submitted on a per-equipment basis, and bundled applications are prohibited.
    • Each application project should, in principle, involve no more than three user units and no more than five development units.
    • The applying units must strictly follow the relevant requirements to complete the application materials, ensuring their completeness, authenticity, accuracy, and traceability for verification, and must not involve state secrets or trade secrets.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[SMM 에너지저장 배터리 셀 시장 주간 리뷰 9.3] 동박 공급 부족으로 9월 생산 일정 제약, 에너지저장 배터리 셀 가격 견조 유지
7시간 전
[SMM 에너지저장 배터리 셀 시장 주간 리뷰 9.3] 동박 공급 부족으로 9월 생산 일정 제약, 에너지저장 배터리 셀 가격 견조 유지
더 보기
[SMM 에너지저장 배터리 셀 시장 주간 리뷰 9.3] 동박 공급 부족으로 9월 생산 일정 제약, 에너지저장 배터리 셀 가격 견조 유지
[SMM 에너지저장 배터리 셀 시장 주간 리뷰 9.3] 동박 공급 부족으로 9월 생산 일정 제약, 에너지저장 배터리 셀 가격 견조 유지
[SMM 분석] 동박 공급 부족과 대용량 배터리 셀의 예상보다 느린 생산능력 확대로 인해, 9월 중국 및 글로벌 에너지저장 배터리 셀 생산 증가율은 전월 대비 각각 4.09%와 4.25%로 둔화될 전망이다. 그러나 이는 최종 수요 약화를 의미하지는 않는다. 에너지저장 배터리 셀의 수급 상황은 여전히 타이트하며, 314Ah 배터리 셀 가격은 안정세를 유지하고 있다. 향후 출하량은 꾸준히 증가할 것으로 예상되며, 가격은 안정적 내지 상승 추세를 이어갈 전망이다.
7시간 전
마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]
7시간 전
마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]
더 보기
마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]
마그네슘 가격 3거래일 연속 상승! 원가 측면은 여전히 '뜨겁게 타오르는' 반면 수요 측면은 바통을 이어받기 어려워 [SMM 논평]
7시간 전
CATL 회장: 중국 상반기 신에너지차 판매 740만 대 돌파, 배터리 생산 정밀성 강조
7시간 전
CATL 회장: 중국 상반기 신에너지차 판매 740만 대 돌파, 배터리 생산 정밀성 강조
더 보기
CATL 회장: 중국 상반기 신에너지차 판매 740만 대 돌파, 배터리 생산 정밀성 강조
CATL 회장: 중국 상반기 신에너지차 판매 740만 대 돌파, 배터리 생산 정밀성 강조
CATL 쩡위췬 회장은 2026 세계 동력 배터리 컨퍼런스 영상 축사에서 올해 상반기 중국 신에너지차 판매가 740만 대를 넘어섰고, 신차 출시가 600종 이상으로 하루 평균 3대에 육박한다고 밝혔다. 모두가 속도, 사양, 가격으로 경쟁하며 개발 주기는 점점 짧아지고 있다. 그는 동력 배터리는 극도로 높은 정밀도가 요구되고 오차 허용 범위가 매우 낮다고 지적했다. 양산 과정에서는 모든 작은 문제가 여러 배로 확대되므로 설계 단계부터 모든 공정과 모든 파라미터를 엄격히 통제하고, 이상 징후를 사전에 식별하며, 품질 문제에 대해 무관용 원칙을 적용해야 한다고 강조했다.
7시간 전
Notice on Organizing the Fifth Batch of Provincial Selection for First (Set) Major Technical Equipment Issued by the Zhejiang Provincial Energy Bureau - Shanghai Metals Market (SMM)