Wencan NEV Lightweight Parts Chongqing Production Site Partially Completed
게시됨: Dec 5, 2024 14:43
공유
공유
저장
[Wencan NEV Lightweight Parts Chongqing Production Site Topped Out for Some Buildings] According to relevant reports, the key project located in Qingfeng Science and Technology Innovation City, Shapingba District, Chongqing, the Wencan NEV Lightweight Parts Chongqing Production Site, has successfully topped out buildings 1, 2, and 3, with approximately 80% of the entire project completed. The project is invested and constructed by Chongqing Wencan Die Casting Co., Ltd., covering an area of 128 mu, with a total construction area of approximately 69,000 m². It will build an integrated smart factory encompassing die casting, machining, post-processing, and assembly processes, creating a research and production base for lightweight integrated auto body structures and power systems for NEVs. Sun Yue, the on-site representative of the Wencan project, introduced that the project is expected to undergo equipment commissioning in April next year and reach full production in H2 next year. The project will install two 12,000T die casting machines to provide customers with integrated and lightweight solutions for NEVs.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.