SMM Survey Reveals September Maintenance, Production Cuts at Domestic Lead Smelters Amid Rising Raw Material Inventories

게시됨: Oct 12, 2024 20:56
[SMM Survey: Domestic Primary Lead Smelters Underwent Maintenance and Production Cuts in September, While Raw Material Inventory Continued to Grow (with Maintenance and Production Scheduling Survey for September-October)] According to the SMM survey on production scheduling, a number of domestic primary lead smelters underwent maintenance in September, with the maintenance cycle ranging from 7 to 20 days. Although domestic smelters mainly focused on maintenance and production cuts in September, they continued to stockpile lead concentrate raw materials, and the number of days of raw material inventory for large and medium-sized smelters still continued to increase...

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn