Primary Lead Smelting Stable During National Day Holiday; Downstream Pre-Holiday Stockpiling Falls Short Year-on-Year

게시됨: Sep 27, 2024 20:07
[SMM Survey: Primary Lead Smelting Operates Steadily During the National Day Holiday, and Downstream Stockpiling Before the Holiday Falls Short of the Same Period Last Year] By Friday of this week, downstream stockpiling before the holiday had basically been completed, with individual downstream manufacturers entering the National Day holiday in advance, and most manufacturers taking 2-5 days off. Primary lead and secondary refined lead smelters started production steadily according to the original production plan. Compared with previous years, the spot market performance was slightly sluggish, and there was a certain expectation of lead ingot accumulation after the holiday...

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
[SMM Survey: Primary Lead Smelting Operates Steadily During the Nation - Shanghai Metals Market (SMM)