Teck's Trail Electrolytic Zinc Plant Hit by Fire, Shutting Down a Quarter of Production Capacity
게시됨: Sep 26, 2024 11:02
공유
공유
저장
[SMM Flash] On September 24, a fire broke out at Teck's Trail electrolytic zinc plant. Although the fire did not cause casualties and is not expected to have an impact on the environment, it led to the closure of one-quarter of the Trail smelter (with a total zinc production capacity of 300,000 tons), while other parts continued production. Lead and other special metals and by-products are also continuing to be produced. Teck is investigating the cause of the incident, and SMM will continue to follow up.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.