Pressure on solar wafer and solar cell inventory accumulation remains【SMM PV Morning Meeting Summary】

게시됨: Sep 13, 2024 11:37
출처: SMM
SMM, September 13: Silica prices remained stable this week.

SMM, September 13: Silica prices remained stable this week. Although some silicon metal producers in south-west China have indicated plans to stop restocking raw materials like silica after current stocks run out and may shut down furnaces earlier than usual, some small silicon enterprises in north-west China are preparing to purchase small batches of raw materials for future resumption of production. Currently, the ex-factory prices for low-grade silica in Yunnan range from 340 to 360 yuan/mt. In Inner Mongolia, high-grade silica ex-factory prices range from 380 to 390 yuan/mt. In Jiangxi, high-grade silica ex-factory prices are between 440 and 480 yuan/mt. In Guizhou, high-grade silica ex-factory prices range from 300 to 330 yuan/mt.

Supply and Demand

Supply: Silica production remains normal, but the overall downstream demand for silica is expected to remain weak, leaving supply relatively ample.

Demand: While demand for silica is expected to weaken in south-west China, some northern silicon enterprises are preparing to purchase raw materials for resumption of production, leading to a slight increase in purchasing demand.

Silicon Metal

Prices: This week's silicon metal prices remained stable. Yesterday, the ex-factory prices of above-standard #553 silicon metal in east China ranged from 11,700 to 11,800 yuan/mt, and 421# silicon (for silicone use) ranged from 12,600 to 12,800 yuan/mt. The silicon market is focused on inquiries, with mainstream spot prices remaining stable amid a standoff between upstream and downstream.

Production: SMM statistics showed that China's silicon metal production in August decreased by 13,000 mt, down 2.7% MoM, but increased by 153,000 mt, up 47.8% YoY. Although there were some minor reductions and shutdowns expected in September, overall supply is expected to remain high.

Inventory: Social inventory: SMM statistics indicated that as of September 6, the total national social inventory of silicon metal was 476,000 mt, down 3,000 mt WoW. Of this, ordinary warehouse inventory was 131,000 mt, up 1,000 mt WoW, while social delivery warehouse inventory (including unregistered warehouse warrants) was 344,000 mt, down 4,000 mt WoW.

Solar Wafers

Prices: The mainstream transaction prices for monocrystalline PV wafers M10 were 1.1-1.2 yuan/piece, and the prices for N-type 18X PV wafers were 1.08-1.15 yuan/piece. This week, wafer prices remained relatively stable with limited market transactions post-quotation, with leading manufacturers sticking to their quoted prices for 183 wafers.

Production: This week, an additional leading enterprise announced plans for production cuts, expected to affect September's production by about 1GW.

Inventory: Solar wafer inventory continued to accumulate this week with limited market transactions.

Solar Cells

Prices: Current prices for high-efficiency PERC 182 solar cells (23.2% efficiency and above) are 0.28-0.28 yuan/W; PERC 210 solar cells are priced around 0.28-0.29 yuan/W; Topcon 182 solar cells (25% efficiency and above) are priced around 0.275-0.28 yuan/W; Topcon 210RN solar cells are priced at 0.27-0.28 yuan/W; Topcon 210 solar cells are priced at 0.28-0.29 yuan/W.

Production: In September, the planned production of Topcon solar cells in China is 44.26GW, PERC solar cells is 5.66GW, HJT solar cells is 0.92GW, and BC production is 2.44GW.

Inventory: Current specialized battery makers still have high inventory levels of 15-20 days, with 18X series inventories remaining substantial.

Prices
EVA/POE PV-grade materials
PV-grade EVA held steady at 9,600-9,800 yuan/mt, while domestic delivery-to-factory price for PV-grade POE was around 12,500-13,500 yuan/mt. There is still a risk of prices falling further.
PV film
The current mainstream prices for film are: 420g transparent EVA film at 5.46-5.67 yuan/sqm, 420g white EVA film at 5.99-6.36 yuan/sqm, 380g EPE film at 6.46-6.65 yuan/sqm, and 380g POE film at 8.74-8.93 yuan/sqm. Prices are temporarily stable.
Production
In September, planned production for PV-grade EVA was above 100,000 mt. The planned production for PV film in September was around 470 million sqm.
Inventory
With the increase in production of PV-grade EVA and the decline in trading volume, inventory increased. Film factories also saw an increase in in-plant inventory due to holiday preparations.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
2시간 전
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
더 보기
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
[태양광: 방글라데시, 5GW 목표로 순계량 옥상 태양광에 kWh당 0.086달러 요금제 도입]
방글라데시 전력부는 자국 순계량 제도에 따라 적격 옥상 태양광 시스템의 잉여 전력에 대해 kWh당 10.50타카(0.086달러)의 요금을 발표했으며, 2030년 2월 28일까지 3년간 유효하다. 배터리 저장장치를 갖춘 옥상 태양광 시스템의 최대 발전 비용은 kWh당 8타카로 설정되었으며, 정부는 20%의 이윤과 11.25%의 프리미엄을 추가했다. 2027년 2월 28일까지 설치되어 2025년 순계량 지침에 따라 적격한 시스템은 인센티브 요금을 받을 수 있다. 정부는 여름철 성수기 수요 시 3GW를 초과하는 일일 전력 부족 문제를 해결하기 위해 내년 여름까지 순계량을 통해 최소 5GW의 태양광 용량을 설치하는 것을 목표로 하고 있다.
2시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
2시간 전
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
더 보기
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
[Solar: 호주 프론티어 에너지, 서호주 Waroona 하이브리드 태양광-배터리 프로젝트 계약 체결]
프론티어 에너지는 서호주 남서부에 위치한 와루나 재생에너지 프로젝트 1단계의 모든 주요 계약을 체결했다고 발표했다. 이 프로젝트는 132MW 규모의 태양광 발전 시설과 81.5MW/565MWh 규모의 배터리 에너지 저장 시스템으로 구성된다. 론지가 650W 및 655W 정격의 태양광 패널 20만 장 이상을 공급하고, 트리나솔라가 20년 보증 및 장기 서비스 계약에 따라 배터리 유닛을 공급하며, SMA가 인버터를 제공한다. 프로젝트 예산은 약 3억 1천만 달러이며, 이번 달에 착공하여 2028년 첫 전력 생산을 목표로 한다. 향후 태양광 1GW 및 저장 용량 660MW 규모로 확장할 계획이다.
2시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
2시간 전
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
더 보기
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
[태양광: 말레이시아, 2.5GW 태양광 및 1.25GW 저장장치를 포함한 LSS6 국가 태양광 프로그램 출범]
말레이시아 에너지전환·수자원전환부는 7월에 LSS6 대규모 태양광 입찰을 시작하여 총 2,500MW의 태양광 용량과 1,250MW의 배터리 에너지 저장장치를 결합하고, 부미푸테라 기업을 위해 150MW를 별도 배정했다. 이는 말레이시아 사상 최대 규모의 유틸리티급 태양광 입찰이자, 태양광-ESS 하이브리드 개발을 의무화한 첫 LSS 라운드이다. 이 프로그램은 약 130억~150억 링깃(약 32억~37억 달러)의 민간 투자를 유치할 것으로 예상되며, 프로젝트는 단계적으로 준공되어 2029년 12월 31일까지 완전 상업 운전을 목표로 한다.
2시간 전
Pressure on solar wafer and solar cell inventory accumulation remains【SMM PV Morning Meeting Summary】 - Shanghai Metals Market (SMM)