게시됨: Aug 12, 2024 10:47

【Successful Ignition of Wire Heating Furnace for Energy Conservation and Environmental Protection Upgrade Project of Xinsteel Electric Arc Furnace】

At 12:58 on August 9, the ignition of the wire heating furnace for the energy conservation and environmental protection upgrade project of Xinsteel Electric Arc Furnace was successfully completed, marking the official entry into the hot test phase. The bar heating furnace of this project was ignited on June 28, and steel was successfully produced on July 29. So far, both heating furnaces of the project have entered a new stage of production. Aiming to build "green, low-carbon, intelligent, and high-efficiency" energy-saving and high-efficiency heating furnaces, the thermal engineering team of Metallurgical Corporation of China South Research Institute (MCCS) has adopted a dual control mode of "ratio + pulse" for the combustion systems of the two furnaces, enabling online switching to meet the heating quality requirements of different steel grades. By applying technologies and equipment such as cascade waste heat utilization and the self-developed and designed MILD flameless burner, full utilization of thermal energy and significant reduction of NOx emissions have been achieved.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn