【Comprehensive Resumption of Production of Electrolytic Aluminum in Yunnan Province】According to the news from SMM on July 19th, it is learned from SMM's research that, as of now, the production of electrolytic aluminum in Yunnan Province that was suspended earlier has been fully resumed, and the total operating capacity of electrolytic aluminum in the province has reached approximately 5.78 million tons, with an increase of approximately 0.9 million tons year-on-year. The preliminary estimate of domestic electrolytic aluminum operating capacity is around 43.34 million tons, an increase of about 0.1 million tons compared with early July. With the continuous release of new production capacity in Inner Mongolia and sporadic resumption of production in Sichuan, it is expected that there will still be a small increase in domestic electrolytic aluminum production capacity.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.