[Xinye Company's 10kV PV Grid-Connected Operation Launched] At 2 PM on July 3rd, as the green electricity was smoothly connected to the 10kV power supply system of Xinye Company, the full-capacity grid-connected operation of the company's comprehensive smart energy parking lot project was officially launched. This project is a part of the comprehensive smart energy project in Xinye Company's factory, with a total installed capacity of 1.153 megawatts. It not only allows employees' vehicles to be parked under the shady photovoltaic panels, but also provides charging functions with the upcoming installation of 10 sets of 120kW DC fast charging piles and 34 sets of 7kW ordinary charging piles. During the construction of the project, the fifth-generation flexible aluminum alloy cables independently developed and the third-generation inverter integration platform developed by Yellow River Company were also adopted.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.