Recently, the electrolytic workshop project (first section) of Indonesia Kalimantan Utara electrolytic aluminum plant area, undertaken by the installation engineering company under China Eleventh Metallurgical Construction Group Corporation, Ltd., was successfully started, marking that the project has officially entered the stage of construction performance. It is understood that the project is led by the Indonesian coal and energy company, PT Adaro Energy Tbk, with an annual production capacity of 500,000 tons of electrolytic aluminum in the first phase.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.