SMM Steel Mills Weekly Maintenance Statistics

게시됨: May 7, 2024 13:31
출처: SMM
SMM estimates that 1.2668 million mt of pig iron output will be lost from blast furnace maintenance during May 4-10, down 87,100 mt on a weekly basis.

SMM estimates that 1.2668 million mt of pig iron output will be lost from blast furnace maintenance during May 4-10, down 87,100 mt on a weekly basis. SMM estimates that 1.0926 million mt of pig iron output will be lost from blast furnace maintenance during May 11-17, down 174,200 mt on a weekly basis.

Rebar: 1.7372 million mt of output will be lost from maintenance during May 4-10, up 2,400 mt on a weekly basis; 1.4219 million mt of output will be lost from maintenance during May 11-17, down 315,300 mt on a weekly basis.

HRC: 137,200 mt of output will be lost from maintenance during May 4-10, down 23,800 mt on a weekly basis; 127,800 mt of output will be lost from maintenance during May 11-17, down 9,500 mt on a weekly basis.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)