SMM Steel Mills Weekly Maintenance Statistics

게시됨: Apr 23, 2024 10:54
출처: SMM
SMM estimates that 1.4839 million mt of pig iron output will be lost from blast furnace maintenance during Apr 20-26, down 193,200 mt on a weekly basis.

SMM estimates that 1.4839 million mt of pig iron output will be lost from blast furnace maintenance during Apr 20-26, down 193,200 mt on a weekly basis. SMM estimates that 1.3555 million mt of pig iron output will be lost from blast furnace maintenance during Apr 27-May 3, down 128,400 mt on a weekly basis.

Rebar: 1.5461 million mt of output will be lost from maintenance during Apr 20-26, down 70,200 mt on a weekly basis; 1.431 million mt of output will be lost from maintenance during Apr 27-May 3, down 115,100 mt on a weekly basis.

HRC: 90,400 mt of output will be lost from maintenance during Apr 20-26, up 90,400 mt on a weekly basis; 161,000 mt of output will be lost from maintenance during Apr 27-May 3, up 70,600 mt on a weekly basis.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)