SMM Steel Mills Weekly Maintenance Statistics

게시됨: Apr 2, 2024 10:22
출처: SMM
SMM estimates that 1.8899 million mt of pig iron output will be lost from blast furnace maintenance during March 23-29, down 67,800 mt on a weekly basis.

SMM estimates that 1.8694 million mt of pig iron output will be lost from blast furnace maintenance during March 30-April 5, down 82,700 mt on a weekly basis. SMM estimates that 1.7563 million mt of pig iron output will be lost from blast furnace maintenance during April 6-12, down 113,100 mt on a weekly basis.
Rebar: 1.6664 million mt of output will be lost from maintenance during March 30-April 5, down 115,000 mt on a weekly basis; 1.5818 million mt of output will be lost from maintenance during April 6-12, down 84,600 mt on a weekly basis.
HRC: 124,000 mt of output will be lost from maintenance during March 30-April 5, down 2,800 mt on a weekly basis; 21,000 mt of output will be lost from maintenance during April 6-12, down 103,000 mt on a weekly basis.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
SMM Steel Mills Weekly Maintenance Statistics - Shanghai Metals Market (SMM)