【Metro Mining announces resumption of bauxite production supply】On March 26, Metro Mining Ltd announced the resumption of bauxite production supply, with mining operations resuming on March 25 and shipments expected to begin on March 26. As the impact of the rainy season diminishes, Metro will gradually resume operations in the coming days to ensure the safe operation of mining systems and management processes, with full operations expected to resume in early April. The bauxite production and shipment guidance range for 2024 is set at 6.3-6.8 million wet metric tons.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.