Scheduled polysilicon production in China was up 2.9% MoM at 155,000 mt in December, but it was 2,000-3,000 mt lower than expected, mainly due to shutdown of some plants for technical upgrade and power rationing policy in Xinjiang and Inner Mongolia. N and P-type materials continued to diverge. The proportion of N-type materials from major manufacturers basically remained above 50%. Scheduled polysilicon production may total 160,000 mt in January.
![[SMM PV 뉴스] 해발 4,700미터! 티베트 야를룽짱부강 중하류 최대 태양광 프로젝트 완공.](https://imgqn.smm.cn/usercenter/rnXTf20251217171741.jpg)
![[SMM PV 뉴스] 미국 에너지부(DOE), 우주 태양광 기술 개발에 1,200만 달러 투자](https://imgqn.smm.cn/usercenter/ZbnfH20251217171741.jpg)
![[SMM PV 뉴스] 유럽 벤치마크 구축 | 치코 솔라 에너지 이탈리아 221MW 추적 시스템 프로젝트 공식 착수](https://imgqn.smm.cn/usercenter/GOtTW20251217171740.jpg)
