The Ecological Environment Bureau of Changchun City recently accepted the construction project of the Integrated Die-casting Super Factory of FAW Foundry Co., Ltd. The project will use the reserved land to build a 9000T die-casting unit and processing production line in the Changchun Automobile Economic and Technological Development Zone, with a construction area of 18,669.75 square meters. It will also be equipped with die-casting mold maintenance equipment, quality inspection equipment, and public power equipment. The project will mainly produce integrated front hood, rear floor, and CTC battery cover products for the new Red Flag models E802 and EHS9, with an annual production of 85,700 die-castings. It is expected that the project will be completed in June 2024.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.