게시됨: Nov 15, 2023 11:37
At 13:17 on November 12th, the No.1 and No.2 refining furnaces in the converter workshop of Daye Iron and Steel Plant were ignited. In order to ensure the trial production is carried out as scheduled, the converter workshop has set up a trial production leading group to be responsible for all the work during the trial production of the blowing process, and to ensure that the equipment is complete and meets the requirements of safe production. It is reported that the firing furnace is expected to take 7 days, during which a special person is arranged to make multi-end temperature measurement and record of the furnace body in real time, and to adjust the real-time data for the subsequent normal production.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn