SMM reported on November 2 that a coal-fired power plant of Xinjiang had a generator unit coal belt accident shutdown in the early morning of November 1. According to the latest news, the relevant aluminum plant was not affected. The aluminum plant has its own power plant unit and aluminum power supply running in parallel. After the problem of the enterprise supporting generator unit, the enterprise temporarily uses network electricity for production, and the electrolytic aluminum plant is in full load production.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.