According to the SMM survey, the output of primary lead in September was expected to increase by more than 3,000 tons. However, according to this survey, a smelter in Henan Province stopped production ahead of schedule, and some smelters reduced production slightly due to increased procurement costs of raw materials, tight supply of high-grade lead ore and lead-containing materials, and other factors, resulting in the output of primary lead in September being lower than expected. In addition, entering October...
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.