The Yukun Iron and Steel Eshan New Base's second 1200m³ blast furnace was ignited on October 8th, replacing the two 1080m³ and 630m³ blast furnaces that were shut down on September 31st at the headquarters. The two previously shut down blast furnaces had an average daily iron output of about 490 tons, while the new blast furnace has an average daily iron output of about 310 tons.【SMM Steel】
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.