The construction of the 10,000-tonne-per-year high-purity silicon project's trichlorosilane synthesis device was completed on schedule, and the synthesis workshop has smoothly shifted from the construction period to the debugging period. The total investment of the project is 160,012,200 yuan, of which 934.8 million yuan is for environmental protection, and 200,000 tonnes/year of high-purity silicon production device is built. The project is divided into two phases of construction, the first phase is to build a 100,000-tonne/year high-purity silicon production device, with a 55,000-tonne waste salt preparation of hydrochloric acid device and a 50,000-tonne trichlorosilane synthesis device; the second phase is to build a 100,000-tonne/year high-purity silicon production device.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.