【Shenhuo Stock】The progress of the new energy power battery project is stable. The project mainly produces aluminum foil for new energy power battery cathode, with 8 sets of 1850mm rolling machines, 8 sets of cutting machines and 3 sets of grinding machines, with an annual capacity of 60,000 tons of new energy power battery foil. At present, 70% of the civil engineering work has been completed, the main equipment is being supplied in succession, and two rolling machine signs have been hoisted, and the installation of rolling machines and other equipment is also progressing according to the plan.
데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.