Tianjin: By 2025, Recycling Capacity of Steel Scrap, Copper Scrap and Other Resources will Reach 8 Million mt

게시됨: Mar 10, 2023 13:28
출처: SMM
Recently, the Implementation Plan for the Construction of Waste Materials Recycling System in Tianjin (hereinafter referred to as "the Plan") was issued.

SHANGHAI, Mar 10 (SMM) - Recently, the Implementation Plan for the Construction of Waste Materials Recycling System in Tianjin (hereinafter referred to as "the Plan") was issued. The Plan is guided by the goal of  carbon peaking and carbon neutrality, takes green and low-carbon circular development as the main line, strengthens standardised management, improves the recycling system of waste materials, improves the level of processing and utilisation of renewable resources, and encourages steel, non-ferrous metals and other production enterprises to expand recycling, processing and utilisation business. The Plan proposes that by 2025, Tianjin's policy system for waste materials recycling will be further improved, and the level of resource recycling will be further improved. A waste materials recycling network system will be basically established, and 1,200 renewable resource recycling outlets, 10 professional and comprehensive green sorting centres will be built.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn