SHANGHAI, Nov 1 (SMM) - Silicon plants in Fujian will cancel orderly power consumption today, and plants are resuming operation one after another.
The power outage will last from September 28 to October 31, which is longer than that notified in the previous document in which states that power rationing period is September 28-30, October 4-7 and October 8-16 in Sanming and September 28-30 and October 4-7 in Longyan). The output in Fujian is expected to to stand at 6,600 mt in November.

![[SMM 크롬 플래시] 글로벌 크롬광 출하량 전주 대비 32.16% 급증한 84만 9,100톤, 리차즈베이 증가 주도](https://imgqn.smm.cn/usercenter/HBsPu20251217171723.jpeg)
![주조 알루미늄 정오 0.67% 상승, 비용 지지로 ADC12 중심가 소폭 상승 [ADC12 가격 일일 리뷰]](https://imgqn.smm.cn/usercenter/teIej20251217171724.jpeg)
