Invest 2.3 billion! Tianhua Chaojing plans to build a project with an annual production capacity of 50,000 tons of new energy lithium materials.

게시됨: Sep 2, 2021 09:30
Invest 2.3 billion! On the evening of September 1, Tianhua Chaojing announced that in order to continuously improve the company's capacity layout in the field of new energy lithium materials business and further expand battery-grade lithium hydroxide production capacity, Tianhua Chaojing and the people's Government of Jiang'an County, Yibin City, Sichuan Province, intend to sign a project investment agreement, with a total investment of about 2.3 billion yuan.

SMM Sept. 2: on the evening of September 1st, Tianhua Chaojing announced that in order to continuously improve the company's capacity layout in the field of new energy lithium materials business and further expand battery-grade lithium hydroxide production capacity, Tianhua Chaojing and the people's Government of Jiang'an County, Yibin City, Sichuan Province, intend to sign a project investment agreement, with a total investment of about 2.3 billion yuan.

It is reported that the project is an annual production capacity of 50,000 tons of new energy lithium materials project, divided into two phases of construction, the project is expected to cover about 470 mu, of which the first phase of the project land is about 155 mu, the second phase of the project land is about 315 mu. It is worth mentioning that the first phase of the project is scheduled to be completed by the end of 2022 and the second phase of the project is scheduled to be completed by June 30, 2024.

Guangfa Securities commented earlier that the supply and demand of lithium hydroxide is tense and the price is expected to go upstream. And Tianhua ultra-clean with the acceleration of capacity expansion in the second half of the year, performance is expected to be further improved. At present, the company's first phase capacity of 20, 000 tons has reached the design scale, and the company will speed up the construction of the second phase of 25000 tons of battery-grade lithium hydroxide project, and strive to complete the project construction in the fourth quarter of 2021 to achieve stable mass production and output. superimposed lithium hydroxide price upward, the company's performance certainty will be further improved.

According to the spot quotation of SMM, as of September 1, the average price of domestic battery-grade lithium hydroxide was 122000 yuan / ton, up 73000 yuan / ton from the end of last year, or 149% this year.

"Click to see more SMM Cobalt Lithium spot market.

SMM research shows that recently, in terms of lithium hydroxide, the spot supply of smelters is relatively small, but the mainstream high nickel plants are also dominated by long orders, with few spot purchases, and the market is relatively stable relative to lithium carbonate. in terms of supply and demand, production continued to increase month-on-month in September, while domestic demand slowed down, and the price rise is expected to slow down. "View details

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[Solid-State Battery Rumor Refuted: CATARC's Wang Fang Says No Compliance Determination Made for Solid-State Battery Enterprises]
5분 전
[Solid-State Battery Rumor Refuted: CATARC's Wang Fang Says No Compliance Determination Made for Solid-State Battery Enterprises]
더 보기
[Solid-State Battery Rumor Refuted: CATARC's Wang Fang Says No Compliance Determination Made for Solid-State Battery Enterprises]
[Solid-State Battery Rumor Refuted: CATARC's Wang Fang Says No Compliance Determination Made for Solid-State Battery Enterprises]
[Solid-State Battery Rumor Refuted: CATARC's Wang Fang Says No Compliance Determination Was Made on Solid-State Battery Enterprises] On September 4, 2026, Wang Fang, Chief Scientist at the China Automotive Technology and Research Center (CATARC), clarified recent rumors at the "2026 World Power Battery Conference": CATARC has not conducted any determination on solid-state battery enterprises, and the related rumors are "false information." Recently, there were market reports claiming that CATARC, based on the national standard GB/T 43568-2026 "Solid-State Batteries for Electric Vehicles – Part 1: Terminology and Classification," which took effect in July this year, conducted determinations on more than 320 enterprises involved in solid-state batteries, with only 9 ultimately passing all compliance items in full.
5분 전
[리튬 배터리: 포산 플라스틱, 고급 분리막 생산능력에 70억 위안 이상 투자 계획]
5분 전
[리튬 배터리: 포산 플라스틱, 고급 분리막 생산능력에 70억 위안 이상 투자 계획]
더 보기
[리튬 배터리: 포산 플라스틱, 고급 분리막 생산능력에 70억 위안 이상 투자 계획]
[리튬 배터리: 포산 플라스틱, 고급 분리막 생산능력에 70억 위안 이상 투자 계획]
포산 플라스틱 테크놀로지(Foshan Plastics Technology)는 9월 3일, 전액 출자 자회사인 거러커(허베이 진리)가 광둥성 사오관에 연 40억㎡ 규모의 습식 분리막 생산기지에 약 33억 5천만 위안을, 허베이성 우안에 연 40억㎡ 규모의 코팅 분리막 프로젝트에 약 38억 1천만 위안을 투자할 것이라고 공시했다. 또한 최대 40억 위안 규모의 사모발행을 계획하고 있으며, 지배주주인 광신그룹이 4억~10억 위안을 청약하여 분리막 공급 규모와 원가 경쟁력 제고를 목표로 한다.
5분 전
[전고체: ProLogium, 381Wh/kg 3.5세대 전고체 셀 양산 시작]
5분 전
[전고체: ProLogium, 381Wh/kg 3.5세대 전고체 셀 양산 시작]
더 보기
[전고체: ProLogium, 381Wh/kg 3.5세대 전고체 셀 양산 시작]
[전고체: ProLogium, 381Wh/kg 3.5세대 전고체 셀 양산 시작]
ProLogium은 9월 2일 자사 3세대 Gen 3.5 리튬 세라믹 배터리가 중국 타이완에 위치한 기가와트급 공장에서 양산에 돌입했다고 발표했다. 이로써 고에너지밀도 전고체 기술이 파일럿 단계에서 대량 생산 단계로 전환됐다. TÜV 시험 결과 185.4Ah 대형 셀은 381Wh/kg 및 903Wh/L에 도달했으며, 중국 표준 GB/T 43568-2026에 따른 UL Solutions 시험에서 전고체 분류가 확인됐다. ProLogium은 2013년 이후 240만 개 이상의 셀을 출하했고 자동차 분야에서 175건 이상의 반복 주문을 확보했다. 차세대 Gen 4 배터리는 기존 생산 라인의 약 10%만 개조하면 되며, AI 데이터센터, 전기차, 해양 및 항공우주 분야를 목표로 한다.
5분 전