Shanghai Pudong promotes high-quality development of key advantageous industries and launches funding for integrated circuits, 5G, etc.

게시됨: Aug 2, 2021 08:16

On July 26th, the Science, Technology and Economic Commission of Shanghai Pudong New area issued the notice on carrying out a number of policies and measures to promote the high-quality development of key advantageous industries in Pudong New area in 2020 (encouraging industrial chain coordination-integrated circuits, supporting the first demonstration, promotion and application, supporting support-city soft market, market war new) special subsidy declaration work (hereinafter referred to as "notice").

According to the notice, the declaration conditions for the six topics are as follows:

Topic 1, GZL-C01 encourages industry chain synergy-integrated circuits (buy IP): during the period from January 1, 2020 to December 31, 2020, buy IP to develop high-end chip products for integrated circuit design enterprises.

Topic 2, GZL-C02 encourages industry chain synergy-integrated circuit (first chip): during the period from January 1, 2020 to December 31, 2020, integrated circuit design enterprises realize engineering product streaming for the first time, and integrated circuit manufacturing enterprises provide integrated circuit design enterprises with the first engineering product streaming service; have the layout registration certificate of the product or the related invention patent.

Topic 3, GZL-C03 encourages industry chain synergy-integrated circuits (multi-project wafer (MPW)): during the period from January 1, 2020 to December 31, 2020, integrated circuit design enterprises carry out multi-project wafer (MPW) projects; have product layout registration certificates or related invention patents.

Topic 4, GZL-C04 supports the first demonstration and promotion application-integrated circuits: the sales volume reaches more than 5 million yuan within one year after the first production, and the invoice time for piao sales must be from January 1, 2020 to December 31, 2020; possess the layout registration certificate of the product or the related invention patent.

Topic 5. GZL-C05 supports the first demonstration, promotion and application-5G: 5G core equipment manufacturers entering the centralized procurement list of telecom enterprises, the sales amount of 5G equipment reached 30 million yuan for the first time last year, and the invoice time for piao sales must be from January 1, 2020 to December 31, 2020. For the enterprises that develop 5G core supporting products for 5G equipment manufacturers, the sales volume of 5G products reached 30 million yuan for the first time last year, and the piao invoice time for sales must be from January 1, 2020 to December 31, 2020; they have independent intellectual property rights related to the products.

Topic 6, GZL-F01, GZL-F02 supporting support-Municipal soft Market, Municipal Warfare: supporting projects supported by Shanghai Municipal industrialization Special funds, which are required to pass the acceptance of the project during the period from January 1, 2020 to December 31, 2020. All municipal support funds will be allocated.

With regard to the objects to be declared, the Circular points out that topics 1, 2 and 3 apply for integrated circuit manufacturing enterprises with industrial and commercial registration and tax household management all in the Pudong New area, with normal operating conditions, good credit records and in line with the notice on issues related to Enterprise income tax preferential policies for Software and Integrated Circuit Industries (Finance and Taxation (2016) No. 49). Integrated circuit design enterprises of the second standard and the third standard.

Topic 4 the objects of application are industrial and commercial registration and tax household management in the Pudong New area, integrated circuit manufacturing enterprises with normal operating conditions, good credit records and compliance with the notice on issues related to preferential Enterprise income tax policies for Software and Integrated Circuit Industries (Finance and Taxation (2016) No. 49) and integrated circuit design enterprises under Article 3. The object of the declaration is the small and medium-sized enterprises that meet the notice on Printing and issuing the provisions on the Classification Standard for small and medium-sized Enterprises (Ministry of Industry and Information Technology Joint Enterprise [2011] No. 300).

Topic 5 the object of application is the communication equipment enterprises with normal business status, good credit record and sound financial system, which are both industrial and commercial registration and tax household management in Pudong New area.

Topic 6 the objects of declaration are enterprises with industrial and commercial registration and tax household management in Pudong New area, which meet the provisions of Pufu Regulation (2020) 2.

In addition, with regard to the declaration channels, the notice points out that the administrations and towns of various districts in the Pudong New area accept the declaration and review and recommend it. It is worth mentioning that the same project or product has been funded by the state, Shanghai and other financial funds at the district level, it will no longer be supported.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
[SMM 크롬 주간 리뷰] 크롬 광석 유입 반등, 중국 항만 재고 증가, 짐바브웨 페로크롬 생산능력 확대 추진
47분 전
[SMM 크롬 주간 리뷰] 크롬 광석 유입 반등, 중국 항만 재고 증가, 짐바브웨 페로크롬 생산능력 확대 추진
더 보기
[SMM 크롬 주간 리뷰] 크롬 광석 유입 반등, 중국 항만 재고 증가, 짐바브웨 페로크롬 생산능력 확대 추진
[SMM 크롬 주간 리뷰] 크롬 광석 유입 반등, 중국 항만 재고 증가, 짐바브웨 페로크롬 생산능력 확대 추진
2026년 9월 11일.
47분 전
[SMM 크롬 플래시] 타리사의 크롬-PGM 주력 광산 지하 전환, 순조롭게 진행 중
56분 전
[SMM 크롬 플래시] 타리사의 크롬-PGM 주력 광산 지하 전환, 순조롭게 진행 중
더 보기
[SMM 크롬 플래시] 타리사의 크롬-PGM 주력 광산 지하 전환, 순조롭게 진행 중
[SMM 크롬 플래시] 타리사의 크롬-PGM 주력 광산 지하 전환, 순조롭게 진행 중
타리사는 남아프리카 부시벨트 콤플렉스 남서부에 위치한 주력 타리사 광산의 지하 채굴 전환이 일정과 예산 범위 내에서 진행되고 있으며, 짐바브웨의 카로 플래티넘 프로젝트 건설 자금 조달과 병행하여 추진되고 있다고 확인했다. 2026년 3월에 착수한 아폴로 지하 복합단지 개발은 이번 분기에 첫 원광 생산을 목표로 진행 중이며, 2029년 3분기까지 월 25만 5천 톤의 안정적 생산 체제를 갖추는 것을 목표로 하고 있다. 오리온 복합단지는 2031 회계연도에 첫 원광 생산을, 2033년 3분기까지 안정적 생산 체제를 갖추는 것을 목표로 뒤따를 예정이다. 타리사는 두 지하 복합단지가 현재 노천광이 고갈된 이후에도 60년 이상 타리사 광산의 채굴을 연장할 것으로 예상된다고 밝혔다. 타리사 광산은 동일한 광체에서 PGM과 함께 크롬 정광을 공동 생산하고 있다. 지하 프로젝트는 압사은행과 스탠다드은행의 개발 대출과 네드뱅크의 자산 기반 회전 신용 공여를 통해 전액 자금이 조달되며, 이 자금은 이번 주 카로를 위해 조달한 3억 달러 규모의 노르딕 본드와는 별도로 운용된다. 회사는 아폴로와 오리온의 향후 원광 생산량 중 크롬 함유 광석과 PGM 함유 광석의 비중을 구분하여 공개하지 않았으며, 두 복합단지가 안정적 생산 체제로 확대됨에 따라 타리사의 크롬 정광 생산량에 미치는 구체적인 영향은 아직 명확히 밝혀지지 않았다.
56분 전
[SMM 크롬 플래시] 타리사: 현물 크롬 가격이 톤당 290달러에 도달하면서 크롬 현금 흐름이 PGM 성장을 지속적으로 지원
1시간 전
[SMM 크롬 플래시] 타리사: 현물 크롬 가격이 톤당 290달러에 도달하면서 크롬 현금 흐름이 PGM 성장을 지속적으로 지원
더 보기
[SMM 크롬 플래시] 타리사: 현물 크롬 가격이 톤당 290달러에 도달하면서 크롬 현금 흐름이 PGM 성장을 지속적으로 지원
[SMM 크롬 플래시] 타리사: 현물 크롬 가격이 톤당 290달러에 도달하면서 크롬 현금 흐름이 PGM 성장을 지속적으로 지원
타리사는 크롬 현금 흐름이 상품 사이클 전반에 걸쳐 PGM 개발을 뒷받침하는 공동 채굴 모델이 성장 전략의 기반을 계속 유지하고 있으며, 2026년 9월 초 기준 크롬 현물 가격은 톤당 290달러에 거래되고 있다고 밝혔다. 회사는 짐바브웨 정부와 특별 채굴 임대 계약을 체결하고, 발테라와 장기 PGM 오프테이크 계약을 맺었으며, 3억 달러 규모의 5년 만기 선순위 담보 노르딕 본드를 발행했다는 소식과 함께 이 수치를 공개했다. 이 세 가지 이정표는 짐바브웨 그레이트 다이크에 위치한 카로 플래티넘 프로젝트의 위험을 낮추고 건설 자금을 완전히 조달한다고 회사는 설명했다. 포에보스 푸룰리스 CEO는 이번 이정표 달성이 타리사에 변혁적인 순간이며, 카로와 타리사 광산의 지하 전환이 모두 가동되면 그룹이 합산 광산 수명 60년 이상의 다중 자산, 다중 관할권 PGM 및 크롬 생산업체로 진화한다고 말했다. 자금 조달 패키지 자체는 PGM 개발을 중심으로 구성되어 있지만, 크롬은 여전히 전략의 자금 조달 중추 역할을 한다. 타리사의 공시는 크롬 수익을 사이클 전반에 걸친 현금 창출원으로 규정하며, 이를 통해 그룹이 외부 자금 조달에만 의존하지 않고 카로와 같은 자본 집약적 PGM 성장 프로젝트를 추진할 수 있다고 설명한다. 이번 주 본드 가격 결정으로 이러한 구도는 바뀌기보다 오히려 재확인되었다.
1시간 전
Shanghai Pudong promotes high-quality development of key advantageous industries and launches funding for integrated circuits, 5G, etc. - Shanghai Metals Market (SMM)