Nornickel has resumed mining at the Oktyabrsky mine after the flood on April 12. Production was resumed ahead of schedule as the drainage work was completed. The mine recovery plan was updated, and it is expected that Oktyabrsky (annual ore output- 5 million mt) will fully resume production by the end of April. Production load has reached 60% of the planned level.