Songhe Recycling Resources’ lead recycling project in Xinhe county begins construction

게시됨: Feb 25, 2019 10:22 (GMT+8)
The project can treat 300,000 mt of retired batteries and lead-containing waste per year

SHANGHAI, Feb 25 (SMM) – The construction of Songhe Recycling Resources’ lead recycling project in Xinhe county of Hebei province began on Saturday February 23, SMM learned.

The project, operated by Xingtai Songhe Environmental Technology, a subsidiary of the Hebei-based Songhe Recycling Resources, can treat 300,000 mt of retired batteries and lead-containing waste per year.

After commissining, the project will produce 200,000 mt of secondary lead and lead alloy and 45,000 mt of plastic raw materials per year. This would be the largest firm in the treatment of lead-bearing waste in China.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스