Limited arrivals from Xinjiang lower aluminium inventory

게시됨: Aug 06, 2018 10:38 (GMT+8)
China's inventory of primary aluminium across eight major markets, including SHFE warrants, shrank 5,000 mt from last Thursday

SHANGHAI, Aug 6 (SMM) – China's inventory of primary aluminium across eight major markets, including SHFE warrants, shrank 5,000 mt from Thursday August 2 to stand at 1.776 million mt as of August 6, SMM data showed. 

Fewer arrivals from smelters in Xinjiang accounted for the drop. The decline came after an increase of 1,000 mt recorded on August 2, from Monday July 30. 

Details are as follows:

Wuxi, Jiangsu – 752,000 mt

Shanghai – 413,000 mt

Nanhai, Guangdong – 237,000 mt

Gongyi, Henan – 158,000 mt

Hangzhou, Zhejiang – 112,000 mt

Tianjin – 55,000 mt

Linyi, Shandong – 27,000 mt

Chongqing – 27,000 mt

 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
KAP Minerals and Cymat Sign Memorandum of Understanding to Jointly Develop Canadian Scandium-Aluminum Alloy SupplyChain
3분 전
KAP Minerals and Cymat Sign Memorandum of Understanding to Jointly Develop Canadian Scandium-Aluminum Alloy SupplyChain
더 보기
KAP Minerals and Cymat Sign Memorandum of Understanding to Jointly Develop Canadian Scandium-Aluminum Alloy SupplyChain
KAP Minerals and Cymat Sign Memorandum of Understanding to Jointly Develop Canadian Scandium-Aluminum Alloy SupplyChain
KAP Minerals and Cymat Technologies, following the signing of a memorandum of understanding, are exploring a partnership in Ontario to produce scandium-aluminum master alloys. The collaboration intends to leverage scandium oxide from KAP's Kapuskasing critical minerals project and Cymat's aluminum processing technology to produce alloys for aerospace, national defense, and manufacturing applications. Scandium-aluminum alloys can enhance strength, performance, and weldability while reducing weight. KAP and Cymat plan to establish a domestic supply chain through the proposed joint venture, converting Canada's critical minerals into value-added industrial materials. Flavio Volpe, President of the Automotive Parts Manufacturers' Association, said: "By combining scandium from Northern Ontario with Canadian manufacturing technology, KAP and Cymat are taking an important step toward building the sovereign industrial capabilities our automotive, aerospace, national defense, and advanced manufacturing sectors require." The project aims to concentrate scandium recovery, processing, and master alloy production within Ontario; KAP and Cymat's goal is to demonstrate commercial-grade scandium-aluminum alloy production by the end of 2027.
3분 전
클리어플로우 메탈웍스, 미국 켄터키에 2차 알루미늄 주조 공장 신설
4분 전
클리어플로우 메탈웍스, 미국 켄터키에 2차 알루미늄 주조 공장 신설
더 보기
클리어플로우 메탈웍스, 미국 켄터키에 2차 알루미늄 주조 공장 신설
클리어플로우 메탈웍스, 미국 켄터키에 2차 알루미늄 주조 공장 신설
클리어플로우 메탈웍스는 켄터키주 러셀빌의 셸턴 레인 산업단지에 알루미늄 제조 공장 건설을 위해 2,800만 달러를 투자할 계획이다. 이 시설은 2차 알루미늄을 가공하여 지속 가능한 제조를 지원하고 미국 내 알루미늄 제품 수요 증가에 대응할 것이다. 이 프로젝트는 단계적으로 개발될 예정이다. 1단계는 연간 약 10만 톤의 생산 능력을 갖춘 2차 알루미늄 주조 공장 건설로, 재활용 알루미늄을 압출 및 기타 후속 제조 용도를 위한 빌릿으로 가공하게 된다.
4분 전
Impact의 Lake Hope 고순도 알루미나 프로젝트 파일럿 플랜트 설치 및 시운전 개시 예정
13분 전
Impact의 Lake Hope 고순도 알루미나 프로젝트 파일럿 플랜트 설치 및 시운전 개시 예정
더 보기
Impact의 Lake Hope 고순도 알루미나 프로젝트 파일럿 플랜트 설치 및 시운전 개시 예정
Impact의 Lake Hope 고순도 알루미나 프로젝트 파일럿 플랜트 설치 및 시운전 개시 예정
11월 5일, 임팩트 미네랄스의 레이크 호프 고순도 알루미나(HPA) 프로젝트는 개발 계획에서 핵심적인 위치를 계속 유지했다. 2025년 6월 예비 타당성 조사(PFS)에 따르면, 10% 할인율 기준으로 이 프로젝트의 순현재가치(NPV)는 11억 6,500만 호주달러(8억 1,560만 달러)이며, 세후 내부수익률(IRR)은 47%로 나타났다. 재무 전망은 약 33년간의 원료 공급을 기반으로 했다. 임팩트 미네랄스는 PFS 생산 목표와 관련 재무 전망을 뒷받침하는 주요 가정이 변함없음을 확인했다. 회사의 다음 주요 운영 이정표는 레이크 호프 파일럿 플랜트의 설치 및 시운전으로, 2026년 11월 30일 시작될 예정이다. 이 시기는 제안된 회사명 변경에 대한 주주 투표와 맞물린다.
13분 전