Tangshan steel mills face new round of cuts for Jul, Aug

게시됨: Jul 11, 2018 13:46
The scheduled restriction period was updated from Jul 10-31, according to a release on Tuesday Jul 10

SHANGHAI, Jul 11 (SMM) – All steel mills in Tangshan will face a fresh round of production cuts from July 20 to August 31, after Tangshan government released official notice on Wednesday July 11. The scheduled restriction period was updated from July 10-31 released on Tuesday July 10. 

This move is part of the municipal government's effort to improve the city's air quality ranking, which currently ranks last among 74 major Chinese cities.

Aiming to reduce the city's atmospheric concentration of sulphur dioxide, nitrogen dioxide, and carbon monoxide, the new round will last longer than previous cuts and will affect blast furnaces. This compared with Tangshan's previous short-term, frequent cut that targeted sintering machines and shaft furnaces, and affected the supply of raw materials. 

Tangshan's annual pig iron capacity of 139.59 million mt accounts for 10.6% of China's total output, SMM data showed. 

Details of cuts for each district remains unclear but according to market talk, capacity will be cut by 50% for blast furnaces at steel plants in the districts of Guzhi, Fengrun, Fengnan, and Luan and Yutian counties. The cut will also apply to all sintering machines and shaft furnaces at steel mills in the city.

Just one blast furnace each will be allowed to operate at Tangsteel south, north, and at Tangyin Iron & Steel, SMM learned from the market. Blast furnaces in plants other than the above-mentioned areas will have to cut capacity by 30%. 

Coking duration at all coke plants in the city is required to be extended to 33 hours. All steel rolling plants in Tangshan will be suspended during the restriction period. 

Such restrictions do not apply to plants with dry desulphurisation facilities.

Mills currently adopt rotating production schedules for the non-heating season, SMM learned.

From March 16 to November 14, steel enterprises in the main urban area of Tangshan are required to cut production by 15%, and those beyond the area will cut by 10%. This is according to the 2018 non-heating season production plan for the iron and steel industry in Tangshan.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
15시간 전
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
더 보기
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
15시간 전
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
2026년 9월 7일 15:43
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
더 보기
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
장시구리그룹 산하 JCC훙위안구리의 연산 30만 톤 음극동 확장 프로젝트가 9월 4일 환경영향평가 사전 승인 공시 단계에 들어갔으며, 총투자액은 약 14억 1,600만 위안이다. 이 프로젝트는 2026년 9월 착공하여 2027년 12월 완공될 예정이다. 완공 후 JCC훙위안의 총 생산능력은 25만 톤에서 55만 톤으로 확대된다.
2026년 9월 7일 15:43
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
2026년 9월 3일 19:00
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
더 보기
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
[SMM 귀금속 익스프레스] 수요일 거래 중 일본 엔화가 급등하며 달러/엔 환율이 159 아래로 떨어졌고, 0.92% 하락한 158.69에 마감하며 일본의 환율 개입 추측을 불러일으켰다. 달러 인덱스도 급락했으며, 약달러 환경이 귀금속에 지지력을 제공했다.
2026년 9월 3일 19:00
Tangshan steel mills face new round of cuts for Jul, Aug - Shanghai Metals Market (SMM)