The table below shows unit maintenance schedules at some domestic steel mills.

SHANGHAI, Sept. 5 (SMM) –The table below shows unit maintenance schedules at some domestic steel mills.

Region

Steel Mill

Maintenance Period

Output Loss

Products Affected

Units under Maintenance

Northeast China

Ansteel

10 days from Sept. 1-10

50,000 tonnes

hot-rolled

1,700 m3

Northeast China

Ansteel

62 days from Sept. 15

55,800 tonnes

hot-rolled

4,083 m3

East China

Laiwu I&S

4 months from Sept. 20

720,000 tonnes

hot-rolled

1,880 m3

East China

Laiwu I&S

4 months from Sept. 28

720,000 tonnes

hot-rolled

1,700 m3

Northwest China

Baogang Group

15 days from Oct. 1-15

150,000 tonnes

hot-rolled

2,250 m3

East China

Jinan I&S

to restart production in late Sept.

180,000-200,000 tonnes

hot-rolled

closing in early July for capacity swap

Southwest China

Panzhihua I&S

1 month from Aug. 4 to Sept. 4

4,500  tonnes

liquid iron

1,750 m3

Northeast China

Benxi Steel Group

to restart production from Sept. 16

150,000 tonnes

liquid iron

#1 4,747 m3

Northeast China

Benxi Steel Group

to restart production Oct. 15

270,000 tonnes

liquid iron

#7 2,850 m3

East China

Masteel

from Jul. 11 to early Oct.

8,000 t/d

liquid iron

4,000 m3

West China

Xinjiang Bayi I&S

20 days from Aug. 30 to Sept. 20

60,000 tonnes

liquid iron

3,000 m3

North China

Tiantie Group

22 days from Sept. 4-25

136,400

tonnes

liquid iron

2,800 m3

East China

Huaigang Special Steel

1 month from Sept. 5 to Oct. 5

35,000 tonnes

bar

530 m3

North China

Xuansteel

12 days from Sept. 1 to 12

17,000 tonnes

bar

 

North China

Chengde Jianlong Special Steel

1 day on Sept. 10

3,000  tonnes

bar

 

East China

Shagang Group Yongxing I&S

already resuming production

already resuming production

bar

line 1 and 2

East China

Fujian Sanbao Steel

4 days

15,000 tonnes

bar

bar line

East China

Shandong LaiGang Yongfeng I&S

resuming production on Aug. 24

40,000 tonnes

bar

bars in coil

Southwest China

Chengyu Vanadium & Titanium Technology

2 days

3,000  tonnes

 

 

North China

Two mills in Xiangfen

2 days

18,000 tonnes

 

 

East China

Quzhou Yuanli Steel 

10 days from Aug. 31 to Sept. 10

25,000-30,000 tonnes

bar

 

East China

Rizhao I&S

10 days from Sept. 10 to 20

30,000 tonnes

section

 

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
2026년 9월 11일 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
더 보기
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
2026년 9월 11일 18:30
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
2026년 9월 7일 15:43
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
더 보기
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
JCC 홍위안 구리, 2억 달러 확장 프로젝트로 2027년까지 생산능력 55만 톤 목표
장시구리그룹 산하 JCC훙위안구리의 연산 30만 톤 음극동 확장 프로젝트가 9월 4일 환경영향평가 사전 승인 공시 단계에 들어갔으며, 총투자액은 약 14억 1,600만 위안이다. 이 프로젝트는 2026년 9월 착공하여 2027년 12월 완공될 예정이다. 완공 후 JCC훙위안의 총 생산능력은 25만 톤에서 55만 톤으로 확대된다.
2026년 9월 7일 15:43
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
2026년 9월 3일 19:00
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
더 보기
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
일본 엔화 상승, USD/JPY 159 아래로 하락 — 개입 추측 속
[SMM 귀금속 익스프레스] 수요일 거래 중 일본 엔화가 급등하며 달러/엔 환율이 159 아래로 떨어졌고, 0.92% 하락한 158.69에 마감하며 일본의 환율 개입 추측을 불러일으켰다. 달러 인덱스도 급락했으며, 약달러 환경이 귀금속에 지지력을 제공했다.
2026년 9월 3일 19:00