Platinum Recycling expected to drop by 6 percent in 2017

게시됨: May 15, 2017 17:26 (GMT+8)
Global platinum supply is expected to fall by 2% year-on-year to 7,330 kilo ounce in 2017, with both primary and secondary supply expected to decline, according to a projection by the World Platinum I

UNITED KINGDOM May 15 2017 2:28 PM

LONDON (Scrap Register): Global platinum supply is expected to fall by 2% year-on-year to 7,330 kilo ounce in 2017, with both primary and secondary supply expected to decline, according to a projection by the World Platinum Investment Council (WPIC).

WPIC's latest Platinum Quarterly report incorporates analysis of platinum supply and demand during the first quarter of 2017, during which time total mine supply hit 1,330 koz, down 6.3% year-on-year and the lowest since Q3 2014. 

Platinum Recycling is projected to fall by 6% year-on-year to 1,760 koz in 2017. Secondary supply from jewellery recycling is projected to decline by 20% year-on-year with recycling trends normalising following unusually large stock flows in China last year.

Automotive demand for 2016 and 2017 is revised upward by 45 koz. The revisions reflect higher than expected global vehicle sales with increased loadings, while greater scrutiny of emissions is also believed to be limiting moves to thrift platinum loadings.

Global platinum ETF holdings grew by 65 koz in the first quarter, with increases observed across most regions. ETF assets in the quarter were at their highest level since the fourth quarter of 2015. Bar and coin demand during the first three months of 2017 was supported by the minting of 20,000 one-ounce US American Eagle bullion coins in January, all of which were sold in just three days. Overall platinum investment demand is now projected to be 250 koz this year.

Global platinum jewellery demand for the quarter increased 3% year-on-year, buoyed by increased Chinese retail sales during the quarter. However, global jewellery demand for 2017 is forecast to slip 1% from 2016, with anticipated declines in China and Japan outweighing gains in India and other regions. 

The platinum market is expected to be broadly balanced over the year, with a deficit of 65 koz in 2017 predicted. Above Ground Stocks are expected to end the year at 1,885 koz, a 3% fall on 2016, but more than 54% down from 2012.

“This quarter’s report reinforces our long held view that supply will become increasingly constrained in 2017, while revisions to the data show that 2016 was more heavily in deficit than previously detailed. Today’s analysis once again shows how robust demand for platinum from the automotive sector continues to confound many negative expectations in the market,” said Paul Wilson, chief executive officer of WPIC.

“We believe that the upward revisions of automotive platinum demand in 2016 and 2017, contained in the report, indicate that automakers are increasing platinum loadings on vehicles in the face of increased scrutiny of emissions levels,” Wilson added.

The launch of the recent C40 independent road-testing initiative, led by the Mayors of London and Paris, sent the strongest of messages to carmakers that they need to act quickly to clean up the most polluting elements of their fleets or face the consequences. WPIC believec that platinum will be an integral part of the solution that the carmakers turn to in 2017 and beyond.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
PGM: 독립 테스트로 백금 및 팔라듐 배터리 기술 발전
2026년 10월 02일 15:48 (GMT+8)
PGM: 독립 테스트로 백금 및 팔라듐 배터리 기술 발전
더 보기
PGM: 독립 테스트로 백금 및 팔라듐 배터리 기술 발전
PGM: 독립 테스트로 백금 및 팔라듐 배터리 기술 발전
[SMM PGM 플래시] 플래티넘 그룹 메탈스는 10월 1일 배터리 이노베이션 센터의 독립 테스트를 통해 자회사 라이온 배터리의 백금·팔라듐 기반 전극이 리튬-황 프로토타입 셀에서 검증되었다고 밝혔다. 촉매가 없는 셀과 비교해 프로토타입은 더 우수한 용량과 율속 특성을 보였으며, 팔라듐 함량이 높은 조성이 전반적으로 가장 뛰어난 성능을 나타냈다. 라이온의 지분 52%와 48%를 각각 보유한 플래티넘 그룹과 발테라 플래티넘은 다음 단계 자금 지원을 승인했다. 이번 결과는 차량 배기가스 촉매를 넘어 PGM의 새로운 용도 가능성을 제시하지만, 여전히 프로토타입 단계의 이정표에 해당한다. 라이온은 파우치 셀 제작 및 테스트, 촉매 개선, 드론 등 응용 분야 평가를 계획하고 있다. 상업적 성능과 상당한 PGM 물량에 대한 수요는 아직 입증되지 않았다. 이번 연구는 남아프리카 공급업체들과 관련이 있는데, 발테라는 남아프리카공화국과 짐바브웨에서 PGM을 생산하고 있으며 플래티넘 그룹은 남아프리카공화국의 워터버그 프로젝트를 개발 중이다.
2026년 10월 02일 15:48 (GMT+8)
시바니에, 이스트 볼더 임금 합의 도달; 미국 내 별도 파업은 지속
2026년 10월 01일 16:45 (GMT+8)
시바니에, 이스트 볼더 임금 합의 도달; 미국 내 별도 파업은 지속
더 보기
시바니에, 이스트 볼더 임금 합의 도달; 미국 내 별도 파업은 지속
시바니에, 이스트 볼더 임금 합의 도달; 미국 내 별도 파업은 지속
[SMM PGM 플래시] 시바니-스틸워터는 9월 30일 몬태나주 이스트 볼더 백금·팔라듐 광산 근로자들이 USW와 단체협약을 비준했다고 발표했다. 이번 합의는 2026년 8월 1일부터 2029년 7월 31일까지 소급 적용되며, 1년차 임금 인상률 4.5%, 2년차 3.5%와 CPI 중 높은 값, 3년차 3.0%와 CPI 중 높은 값이 적용된다. 별도 사업장인 스틸워터 이스트 광산과 콜럼버스 제련 시설의 파업은 계속되고 있다고 회사 측은 밝혔다. 이스트 볼더 합의는 시바니의 미국 PGM 사업 인건비 경로의 일부를 확정하고, 보다 기계화된 채굴 방식과 팀 기반 인센티브로의 전환 계획을 뒷받침한다. 다만 다른 파업을 해결하거나 생산량 회복을 입증하지는 못했으며, 회사는 이번 발표에서 수정된 생산 가이던스를 공개하지 않았다.
2026년 10월 01일 16:45 (GMT+8)
[SMM 귀금속 속보]
2026년 09월 30일 19:22 (GMT+8)
[SMM 귀금속 속보]
더 보기
[SMM 귀금속 속보]
[SMM 귀금속 속보]
노르웨이 수소 기업 넬 하이드로젠의 미국 자회사가 콜린스 에어로스페이스로부터 양성자 교환막(PEM) 전해조 스택에 대한 1,200만 달러 규모의 조달 주문을 확보했다.
2026년 09월 30일 19:22 (GMT+8)