BHP Billiton Lowers Copper and Coking Coal Production Guidance for 2017

게시됨: Apr 26, 2017 10:00 (GMT+8)
BHP Billiton has cut annual production guidance of copper and coking coal for 2017 due to long-time strike at Chilean Escondida copper mine and bad weather in east Australia.

SHANGHAI, Apr. 26 (SMM) - BHP Billiton has cut annual production guidance of copper and coking coal for 2017 due to long-time strike at Chilean Escondida copper mine and bad weather in east Australia,  reported by foreign medium.

Coking coal output increased 2% YoY to 31 million tonnes over the nine months to March 31, and its annual output target has been cut to 39-41 million tonnes.

Copper output fell 20% YoY to 939,000 tonnes as of March 31 in response of a 44-day strike at the Escondida mine. The company thus has lowered the copper production guidance to 1.33-1.36 million tonnes in 2017 fiscal year.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn