Tin output recovers in Q3, operating costs see sharp drop

게시됨: Nov 03, 2016 09:03 (GMT+8)
PT Timah- Indonesia’s state-controlled tin company reported strong production during Q3 this year. The mine production totaled 6,865 tonnes of tin-in-concentrate during Q3 this year.

By Anil Mathews

BEIJING (Scrap Monster): Major Tin mines have reported increased output during the third quarter of the current year. Also, most companies reported healthy financial results in Q3, mainly on the back of recovery in tin price and reduction in operating costs. Meantime, a few companies have announced plans to expand their operations.

PT Timah- Indonesia’s state-controlled tin company reported strong production during Q3 this year. The mine production totaled 6,865 tonnes of tin-in-concentrate during Q3 this year. The output jumped higher by 9% when matched with the corresponding quarter last year. The Q3 output has surged higher by nearly 20% when compared with the prior quarter. The production from onshore mining operations has almost doubled from the previous quarter.

The refined tin output totaled 6,475 tonnes during Q3 this year, significantly higher by 22% over Q2 this year. However, when matched with Q3 last year, the refined tin output during this quarter fell by almost 2%.

The tin mine production during the initial nine-month period of the year totaled 15,973 tonnes, whereas the refined tin output totaled 15,995 tonnes during this period. The cumulative output during the first three quarters of 2016 has declined sharply by 23% when matched with the output during the corresponding period in 2015.

PT Timah reported profit of nearly $3.8 million during Q3 this year. The revenues dropped by almost 9% when compared with 2015. The cost of revenues too declined significantly by 12% over the previous year. The tin inventory at the end of Q3 totaled 13,846 tonnes, marginally higher than Q2. Tin ore stocks rose 17% to 1,973 tonnes during the quarter. On the other hand, refined tin inventory levels have declined sharply by 35% to 3,790 tonnes. The tin slag stocks remained mostly unchanged at 8,083 tonnes during Q3 2016.

The company stated that it plans to construct a fuming plant at its Muntok smelter in an attempt to boost tin recoveries by controlling the quantity of tin discarded in slags. The company also intends to stream line its operations by laying aside unprofitable operations. At the same time, PT Timah announced its plans to add new mining vessels to increase mining throughput from onshore and offshore operations.

Renison tin mine in Tasmania too reported sharp jump in production to 1,718 tonnes during Q3 this year. The production surged higher by 49% when matched with Q2 and increased by 4.5% when compared with Q3 2015. The output during the initial nine-month period of the year totaled 4,546 tonnes. The ramp up in production signals the possibility of higher tin output from the mine in 2017, as compared with 2015, noted ITRI. However, the yearly output in 2016 is likely to remain lower than the 2015 output of 6,816 tonnes of tin-in concentrate.

Meantime, Australia-based junior Aus Tin Mining which had begun production from its Granville Tin Project in Tasmania in August this year has announced that the company’s production is likely to total around 50 tonnes of tin-in-concentrate during 2016. The company has carried out several measures to increase the throughput. It plans to expand the operation by resuming mining at Granville East Open Pit and constructing a new processing plant at the mine facility.

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
【Flash | DOWA의 H2 아연 계획 27% 상승, 인듐 회수 지원 가능성】
14시간 전
【Flash | DOWA의 H2 아연 계획 27% 상승, 인듐 회수 지원 가능성】
더 보기
【Flash | DOWA의 H2 아연 계획 27% 상승, 인듐 회수 지원 가능성】
【Flash | DOWA의 H2 아연 계획 27% 상승, 인듐 회수 지원 가능성】
DOWA 홀딩스는 2026 회계연도 하반기에 아연 113,543톤을 생산할 계획으로, 이는 상반기 계획 89,373톤 대비 27.0%, 2025 회계연도 하반기 실적 89,525톤 대비 26.8% 증가한 수치다. 아키타 아연 제련소는 헤마타이트 공법을 사용해 인듐 및 기타 유가금속을 높은 수율로 회수하며, 아연 제련과 희소금속 생산 및 재활용을 통합 운영한다. 아연 생산 계획 증가는 부산물인 인듐 회수를 위한 원료 처리량을 늘릴 수 있다. 다만 DOWA는 인듐 생산 목표를 공개하지 않았으며, 공급 증가 여부는 아연 생산량 자체보다 원료 품위, 회수율, 가동 일정에 달려 있다.
14시간 전
【Flash | 코히런트의 PhotonLink, 인화인듐(InP) 상용화 확대의 발판 마련】
2026년 10월 02일 14:34 (GMT+8)
【Flash | 코히런트의 PhotonLink, 인화인듐(InP) 상용화 확대의 발판 마련】
더 보기
【Flash | 코히런트의 PhotonLink, 인화인듐(InP) 상용화 확대의 발판 마련】
【Flash | 코히런트의 PhotonLink, 인화인듐(InP) 상용화 확대의 발판 마련】
Coherent는 인공지능 인프라를 위한 통합 광학 플랫폼인 PhotonLink를 출시했다. 이 플랫폼은 인화인듐(InP) 레이저, 실리콘 포토닉스, 검출기 및 광모듈을 통합한다. 회사는 10건 이상의 CPO 협력, 10건 이상의 NPO 협력, 5건 이상의 칩 간 연결 프로젝트를 공개했으며, CPO와 NPO 모두에서 핵심 고객 및 장기 계약을 확보했다. 매출은 2026년 4분기부터 증가하기 시작할 것으로 예상된다. Coherent는 3억 개 이상의 InP 레이저를 출하했으며, 생산 확대를 지원하기 위해 6인치 InP 제조 역량을 확장하고 있다. 고객 파이프라인은 InP 소자 및 상류 소재에 대한 보다 명확한 상업적 수요 신호를 제공하지만, 추가 용량과 인듐 소비량은 공개되지 않았다.
2026년 10월 02일 14:34 (GMT+8)
기관: 아이폰 18 프로 시리즈 중국 첫 주 판매 전년 대비 12% 증가
2026년 09월 30일 18:09 (GMT+8)
기관: 아이폰 18 프로 시리즈 중국 첫 주 판매 전년 대비 12% 증가
더 보기
기관: 아이폰 18 프로 시리즈 중국 첫 주 판매 전년 대비 12% 증가
기관: 아이폰 18 프로 시리즈 중국 첫 주 판매 전년 대비 12% 증가
카운터포인트 리서치의 차이나 스마트폰 주간 판매 트래커에 따르면, 중국의 주간 스마트폰 판매량은 7월 이후 전년 동기 대비 두 자릿수 감소세를 유지하고 있다. 저장 장치 가격 상승의 영향으로 소비자 수요는 여전히 약세를 보이고 있으나, 9월 신제품 출시 주기가 도래함에 따라 시장은 전월 대비 회복세를 보일 것으로 예상된다. 아이폰 18 프로 시리즈는 출시 후 첫 3일간(38주차 중 3일만 집계)의 판매량이 아이폰 17 프로 시리즈의 첫 주 판매량 대비 전년 동기 대비 12% 증가했다. 이러한 강력한 출발에 힘입어 애플은 38주차 주간 판매 순위 1위를 차지하며 중국 스마트폰 시장 점유율 33%를 기록했다.
2026년 09월 30일 18:09 (GMT+8)