ICSG: Refined copper market ended in deficit during Jan- July 2016

게시됨: Oct 25, 2016 10:14 (GMT+8)
The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday.

October 24, 2016 08:00:48 AM
SPOKANE (Scrap Monster): The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday. According to preliminary ICSG data, copper production and usage data points to an apparent production deficit of nearly 264,000 metric tonnes.

The International Copper Study Group (ICSG) has released preliminary data for the month of July this year in its October 2016 Copper Bulletin published yesterday. According to preliminary ICSG data, copper production and usage data points to an apparent production deficit of nearly 264,000 metric tonnes.

The refined copper market balance for the month of July ‘16 alone showed an apparent production surplus of nearly 133,000 metric tonnes. The apparent refined copper demand from China remained weak during the month. The production surplus for the month, after making seasonal adjustments for global refined copper production and usage, stood at 105,000 metric tonnes. The refined copper balance for the first seven-month period of the year ended in production deficit of around 264,000 metric tonnes as compared with the deficit of around 7,000 tonnes during the same period in 2015.

World refined copper production increased by nearly 2.8% (nearly 370,000 t) during the first seven months of 2016 in comparison with the corresponding seven-month period from January to July last year. Primary production was up 2.5%, whereas the secondary production was up by 5%. The refined copper production during the month witnessed significant growth of 6% in China. The production by the US witnessed an increase of 15%. The output by Chile and Japan witnessed rise of 2% and 3% respectively. The other regions to report rise in refined output were the Americas (6%), Asia (5%) and Oceania (8%). On the other hand, the refined copper output by African region declined by 14%. The declined output from the region was mainly on account of temporary production cuts in some regions of the DRC and Zambia. The output by European region too witnessed decline of 3%.The worldwide refineries reported capacity utilization rate of 83%, more or less unchanged from that during the same period a year before.

The world copper mine production has increased by around 5.0% (nearly 560,000 t) during the initial seven-month period of 2016. Concentrate production was up by 6.5% during the period. The mine output from Peru reported significant improvement of 47%, primarily on account of new and expanded capacities becoming online during the past two years. The recovery in production by Canada, the US and Mongolia and expanded capacity in Mexico also contributed to the sharp recovery in production levels. The production declined by 5% in Chile during the month. The mine output from the DRC too dropped sharply by 9% year-on-year. Region-wise, Asia recorded 8% rise in production. Also Americas recorded 7.0% rise in output. On the other hand, the Africa region recorded production decline of 4.5%. The production held flat over the previous year in Oceania. The mine output by the European region remained flat during Jan-July ‘16. The mine capacity utilization rates remained essentially unchanged during the first seven-month period this year at 84.5% when compared with the year-ago period.

Meantime, global usage of the metal is estimated to have increased by around 4% during January to July this year in comparison with the year before. The Chinese apparent demand increased sharply by 9%. The usage by world countries excluding China has registered marginal increase of 0.50%. The European demand rose by 3.5%, whereas it declined by 11% and 4.5% in Africa and the Americas.

The table given below provides World Refined Copper Supply Trends for the first seven months of the current year:

 

Jan

Feb

Mar

Apr

May

Jun

Jul

World Mine Production

1,580

1,519

1,685

1,631

1,721

1,695

1,687

World Refined Production

1,952

1,821

1,988

1,914

1,914

1,914

1,979

Note: The above figures are in thousand metric tonnes

데이터 출처 설명: 공개 정보를 제외한 모든 데이터는 SMM이 공개 정보, 시장 커뮤니케이션 및 SMM 내부 데이터베이스 모델을 기반으로 가공한 것입니다. 본 자료는 참고용이며 의사결정 권고를 구성하지 않습니다.

문의 사항이 있거나 자세한 정보를 원하시면 아래로 연락해 주시기 바랍니다: lemonzhao@smm.cn
리서치 보고서 열람 방법에 대한 자세한 내용은 아래로 문의하시기 바랍니다:service.en@smm.cn
관련 뉴스
【속보 | BHP 자금 지원 프로그램, 아르헨티나 엘 데스티노 구리-금-몰리브덴 타깃 시추 진척】
3시간 전
【속보 | BHP 자금 지원 프로그램, 아르헨티나 엘 데스티노 구리-금-몰리브덴 타깃 시추 진척】
더 보기
【속보 | BHP 자금 지원 프로그램, 아르헨티나 엘 데스티노 구리-금-몰리브덴 타깃 시추 진척】
【속보 | BHP 자금 지원 프로그램, 아르헨티나 엘 데스티노 구리-금-몰리브덴 타깃 시추 진척】
Kobrea Exploration Corp.가 아르헨티나 멘도사주 서부 말라르궤 광구에 대한 2026/27년도 400만 달러 규모 탐사 프로그램 승인을 발표했다. 자금은 BHP가 전액 지원한다. 이 프로그램에는 엘 데스티노 구리-금-몰리브데넘 반암 타깃에 대한 다이아몬드 시추, 엘 데스티노 및 KBX-17에 대한 유도분극 탐사, 지질 매핑, 지화학 시료 채취, 초분광 분석이 포함된다. 탐사 제휴는 약 733제곱킬로미터에 달하는 7개 프로젝트를 대상으로 하며, 이 지역에서 구리, 금, 몰리브데넘 지화학 이상대가 확인된 바 있다. SMM 분석: 신규 예산 승인으로 BHP-Kobrea 파트너십은 제휴 체계에서 실제 시추 단계로 전환된다. 다만 해당 광구들은 여전히 초기 탐사 단계에 있으며, 몰리브데넘은 아직 확인되지 않았다.
3시간 전
【속보 | 글렌코어, 엘 파촌 동-몰리브덴 프로젝트 환경 신청서 2027년 1분기 제출 목표】
3시간 전
【속보 | 글렌코어, 엘 파촌 동-몰리브덴 프로젝트 환경 신청서 2027년 1분기 제출 목표】
더 보기
【속보 | 글렌코어, 엘 파촌 동-몰리브덴 프로젝트 환경 신청서 2027년 1분기 제출 목표】
【속보 | 글렌코어, 엘 파촌 동-몰리브덴 프로젝트 환경 신청서 2027년 1분기 제출 목표】
글렌코어는 아르헨티나 엘 파촌 구리-몰리브덴 프로젝트의 환경영향보고서를 2027년 1분기에 제출할 계획이며, 대규모 투자 인센티브 제도(RIGI)에 따른 승인을 2027년 7월 이전에 확보하는 것을 목표로 하고 있다. 글렌코어는 앞서 평균 품위 구리 0.43%, 은 2.2g/t, 몰리브덴 130g/t(약 0.013% Mo)의 광물자원량 약 60억 톤을 보고한 바 있다. 공개된 톤수와 평균 품위를 기준으로 할 때, 해당 자원량에는 약 78만 톤의 매장 몰리브덴이 포함되어 있으나, 이는 매장량, 회수 가능한 금속 또는 향후 생산량을 의미하지는 않는다. 2025/26 탐사 시즌 동안 이 프로젝트는 총 2만 1,246m에 달하는 53개의 시추공을 완료했으며, 예비 도로 및 교량 인프라를 추진했다.
3시간 전
【Flash | 글렌코어, 아르헨티나 아구아리카 구리-금-은-몰리브덴 프로젝트 RIGI 승인 획득】
3시간 전
【Flash | 글렌코어, 아르헨티나 아구아리카 구리-금-은-몰리브덴 프로젝트 RIGI 승인 획득】
더 보기
【Flash | 글렌코어, 아르헨티나 아구아리카 구리-금-은-몰리브덴 프로젝트 RIGI 승인 획득】
【Flash | 글렌코어, 아르헨티나 아구아리카 구리-금-은-몰리브덴 프로젝트 RIGI 승인 획득】
글렌코어는 아구아리카 프로젝트(MARA)가 아르헨티나의 대규모 투자 인센티브 제도(RIGI) 승인을 받았다고 발표했다. 이 대규모 구리-금-은-몰리브데넘 광상은 측정 및 지시 광물자원량 약 12억 톤, 평균 몰리브데넘 품위 0.03%를 보유하고 있다. 공개된 톤수와 품위 기준으로 약 36만 톤의 매장 몰리브데넘을 함유하나, 이는 매장량, 회수 가능 금속 또는 향후 몰리브데넘 생산량을 의미하지는 않는다. 글렌코어는 또한 알룸브레라 재가동의 최초 생산 시점을 2028년 상반기에서 2027년 하반기로 앞당겼다. 알룸브레라의 처리, 물류 및 인력 인프라는 향후 MARA 개발을 지원할 것으로 기대된다. SMM 분석: RIGI 승인으로 프로젝트의 재정 및 규제 불확실성이 개선되지만, 최종 투자 결정, 몰리브데넘 회수 계획 또는 생산량 가이던스가 발표되지 않아 몰리브데넘 공급에 대한 단기적 직접 영향은 없다.
3시간 전