Tender Pengadaan Kabel Proyek Renovasi Tanpa Kebocoran Menara Suar Gas Batu Bara Tanur Tiup Bayuquan

Telah Terbit: Jul 9, 2026 14:32

1. Ketentuan Pengadaan

Proyek pengadaan ini, Kabel untuk Proyek Renovasi Tanpa Kebocoran Menara Suar Gas Batubara Tanur Tiup Bayuquan (AGDQGSHGXHD260707302293), memiliki Ansteel Electric Co., Ltd. sebagai pembeli. Dana pengadaan berasal dari dana sendiri, dan proyek ini memenuhi syarat pengadaan, sehingga kini dilakukan penyelidikan dan perbandingan terbuka.

2. Gambaran Umum Proyek dan Lingkup Pengadaan

2.1 Nama Proyek: Kabel untuk Proyek Renovasi Tanpa Kebocoran Menara Suar Gas Batubara Tanur Tiup Bayuquan

2.2 Apabila pengadaan gagal, beralih ke metode pengadaan lain: pengadaan langsung dan pengadaan negosiasi

2.3 Untuk rincian isi, ruang lingkup, dan skala pengadaan proyek ini, lihat lampiran Bill of Materials Lampiran.pdf.

3. Persyaratan Kualifikasi Penawar

3.1 Penawaran gabungan tidak diterima untuk pengadaan ini.

3.2 Penawar untuk pengadaan ini harus memenuhi persyaratan kualifikasi berikut:

Lihat lampiran (jika diperlukan)

3.3 Penawar untuk pengadaan ini harus memenuhi persyaratan modal terdaftar berikut:

Modal terdaftar untuk perusahaan berbasis produksi: tidak kurang dari 100 juta yuan

3.4 Penawar untuk pengadaan ini harus memenuhi persyaratan kinerja berikut:

Satu catatan kinerja penjualan untuk produk sejenis, termasuk kontrak dan faktur terkait

3.5 Penawar untuk pengadaan ini harus memenuhi persyaratan kemampuan, keuangan, dan lainnya berikut:

Persyaratan keuangan: Lihat lampiran (jika diperlukan)

Persyaratan kemampuan: Lihat lampiran (jika diperlukan)

Persyaratan lainnya: 1. Menyediakan izin usaha dengan masa pendaftaran tidak kurang dari satu tahun sejak tanggal pembukaan penawaran; 2. Menyediakan Lisensi Produksi Produk Industri Nasional.

3.6 Untuk proyek yang tunduk pada penawaran berdasarkan hukum, penawaran dari pihak yang tidak jujur yang dikenai eksekusi tidak sah.

4. Perolehan Dokumen Pengadaan

4.1 Siapa pun yang berminat mengajukan penawaran harus masuk ke Ansteel Smart Bidding Platform di http://bid.ansteel.cn mulai pukul 16:00, 8 Juli 2026 hingga pukul 08:00, 17 Juli 2026 (waktu Beijing, sama seterusnya) untuk mengunduh dokumen pengadaan elektronik.

Klik untuk melihat rincian tender:

Pernyataan Sumber Data: Kecuali informasi yang tersedia untuk publik, semua data lainnya diproses oleh SMM berdasarkan informasi publik, komunikasi pasar, dan mengandalkan model database internal SMM. Hanya untuk referensi dan tidak menjadi rekomendasi pengambilan keputusan.

Untuk pertanyaan atau informasi lebih lanjut, silakan hubungi: lemonzhao@smm.cn
Untuk informasi lebih lanjut tentang cara mengakses laporan penelitian kami, hubungi:service.en@smm.cn
Berita Terkait
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
5 menit yang lalu
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
Baca Selengkapnya
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
The most-traded HRC futures contract closed at 3298 today, up 0.12% for the day. Spot side, sheets & plates prices mostly held steady, with overall transactions pulling back slightly from the previous trading day, and end-user wait-and-see sentiment was relatively strong. SMM's weekly HRC supply-demand balance data was released today: affected by maintenance at some steel mills, HRC production fell WoW this week. Inventory side, SMM's statistics showed social inventory of HRC at 86 warehouses nationwide (large sample) at 4.3425 million mt, down 33,200 mt WoW (-0.76%), and up 45.74% lunar YoY. By region, the Northeast market saw a larger destocking, Central China market accumulated slightly, and South China, East China, and North China markets moved sideways in destocking. This week, inventory edged lower. Inventory is expected to enter an accumulation phase from next week, with supply-demand imbalance gradually intensifying. Overall, in the short term, sheets & plates prices consolidated near the bottom, with the most-traded HRC contract watched at 3270-3330. Watch factors such as macro meeting hype and the intensity of steel mill production cuts in mid-to-late month. HRC price fluctuation range is expected to widen in mid-to-late this month.
5 menit yang lalu
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
9 menit yang lalu
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
Baca Selengkapnya
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
9 menit yang lalu
[ArcelorMittal Pecém menyetujui fase pertama proyek koil canai panas di Brasil]
27 menit yang lalu
[ArcelorMittal Pecém menyetujui fase pertama proyek koil canai panas di Brasil]
Baca Selengkapnya
[ArcelorMittal Pecém menyetujui fase pertama proyek koil canai panas di Brasil]
[ArcelorMittal Pecém menyetujui fase pertama proyek koil canai panas di Brasil]
Fasilitas Pecém milik ArcelorMittal di Ceará telah menyetujui fase pertama proyek strategis untuk lini produksi baja canai panas (hot-rolled coil) baru. Fase ini melibatkan investasi sebesar BRL 35 juta ($6,8 juta) dalam rekayasa dan pengembangan, tidak termasuk konstruksi atau pengadaan peralatan. Konstruksi fisik bergantung pada hasil studi dan persetujuan dewan selanjutnya. Proyek penuh, yang diperkirakan senilai BRL 4,5 miliar ($872 juta), dapat menciptakan 3.000 lapangan kerja konstruksi. Saat ini memproduksi 3 juta ton slab per tahun, pabrik ini bertujuan menambahkan HRC ke dalam outputnya guna meningkatkan nilai produk.
27 menit yang lalu
Tender Pengadaan Kabel Proyek Renovasi Tanpa Kebocoran Menara Suar Gas Batu Bara Tanur Tiup Bayuquan - Shanghai Metals Market (SMM)