Gold Resource Reports Q1 2026 Production, Zinc Output Up 64%

Published: May 19, 2026 11:59
[Zinc Concentrates Production Information] Gold Resource disclosed its Q1 2026 production. Its zinc metal content production was 1,143 mt during the quarter. Total ore processed during the quarter was 74,444 mt, an increase of 31% compared to the same period in 2025. Gold and silver production increased by 126% and 54%, respectively. Copper, lead, and zinc production also increased by 39%, 36%, and 64%, respectively.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Orient Cable and Subsidiary Win Bids Worth Approximately RMB 5.231 Billion Across Various Projects
2 hours ago
Orient Cable and Subsidiary Win Bids Worth Approximately RMB 5.231 Billion Across Various Projects
Read More
Orient Cable and Subsidiary Win Bids Worth Approximately RMB 5.231 Billion Across Various Projects
Orient Cable and Subsidiary Win Bids Worth Approximately RMB 5.231 Billion Across Various Projects
[Orient Cable: Recent Bid-Winning Amount Approximately RMB 5.231 Billion] Orient Cable announced that recently, the company and its wholly-owned subsidiary, Dongfang Offshore Engineering Institute, have successively received relevant bid-winning notices and bid-winning announcements, confirming the company and Dongfang Offshore Engineering Institute as the bidders for the relevant projects. Among them, the bid-winning amount for power engineering and equipment cables is approximately RMB 3.356 billion; the bid-winning amount for new energy power (submarine cables and high-voltage cables) is approximately RMB 1.113 billion; and the bid-winning amount for marine equipment and engineering operation and maintenance projects is approximately RMB 762 million. The combined bid-winning amount of the above projects is approximately RMB 5.231 billion.
2 hours ago
Physical premiums dropped significantly, while forward buying interest emerged [SMM Yangshan spot copper]
4 hours ago
Physical premiums dropped significantly, while forward buying interest emerged [SMM Yangshan spot copper]
Read More
Physical premiums dropped significantly, while forward buying interest emerged [SMM Yangshan spot copper]
Physical premiums dropped significantly, while forward buying interest emerged [SMM Yangshan spot copper]
4 hours ago
Data: SHFE, DCE market movement (Jun 10)
4 hours ago
Data: SHFE, DCE market movement (Jun 10)
Read More
Data: SHFE, DCE market movement (Jun 10)
Data: SHFE, DCE market movement (Jun 10)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 10 Jun , 2026
4 hours ago